WELL · 42-083-35530 · DISTRICT 7
Hudson #5A
Coleman County · Coleman County Regular field · Vertical
Hudson #5A (API 42-083-35530) is a well in Coleman County operated by Subsurface Production Inc., completed August 3, 1997.
The RRC has issued one drilling permit, issued April 25, 1997, permitted to 4,200 ft.
It was permitted by Caddo Operating Inc. and has since transferred to Subsurface Production Inc. on the wellbore schedule.
Completion filings report one formation top, including Gardner.
Its 2 leases have reported 6.57K barrels of oil and 832 mcf of gas since May 1997, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Caddo Operating Inc.; the EWA schedule now lists a different operator.
Beeville, TX · P-5 Y, filed Jul 4, 2026 · (361) 254-3737
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Subsurface Production Inc. |
| Production reports | Subsurface Production, Inc.through Dec 2020 |
| Latest permit | Caddo Operating Inc.Apr 25, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,200
- total depth, ft
- 1
- permits on file
- Apr 25, 1997
- last permit issued
- Aug 3, 1997
- completed
- 6.57K
- cumulative oil, bbl
- 832
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1997 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 3, 1997
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hudson O-8-28170 | Coleman County Regular | Subsurface Production, Inc. | 4 | 3.81K | 654 | May 1997 – Jul 2026 |
| Hudson 5A & 6A O-8-28445 | Coleman County Regular | Subsurface Production, Inc. | 2 | 2.76K | 178 | Apr 1998 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Caddo Operating Inc.May 1997 → Jul 2001
- 2Subsurface Production, Inc.Dec 2005 → Dec 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 461631-99 | Drill | Caddo Operating Inc. | Apr 25, 1997 | Apr 25, 1997 | Jul 25, 1997 | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-28170 | — | — | — | — |
| — | — O-8-28445 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,564 | 3,576 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 103 | 12.25 | 75 S |
| 4.5 | 3,750 | 7.875 | 270 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 28, 1998 | Oct 16, 1997 | Yes |
| 00 | Mar 6, 1998 | Oct 16, 1997 | Yes |
| 00 | Feb 25, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-35530 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-35530 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08335530, documented in the API reference.