WELL · 42-083-35779 · DISTRICT 7

Lavelle-Smith Unit #18

N

Coleman County · Lake Coleman (Morris 2750) field  · Vertical

Lavelle-Smith Unit #18 (API 42-083-35779) is a well in Coleman County operated by Pony Express Corporate Trust, completed November 12, 2008.

The RRC has issued 2 drilling permits between 2008 and 2010, permitted to 4,999 ft.

It was permitted by Encon Services, Inc. and has since transferred to Pony Express Corporate Trust on the wellbore schedule.

Completion filings report 5 formation tops, including Morris, Gardner, Gray, Caddo.

Its 2 leases have reported 258K barrels of oil and 176K mcf of gas since September 2000, last reporting in July 2026. The leases carry 18 wells, so these are lease totals, not this well alone.

Operator of record

Pony Express Corporate Trust

Permitted by Encon Services, Inc.; the EWA schedule now lists a different operator.

Aledo, TX · P-5 Y, filed Nov 4, 2025 · 3 permits on file · (214) 957-2475

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePony Express Corporate Trust
Production reportsPony Express Corporate Trustthrough Apr 2026
Latest permitEncon Services, Inc.Jan 27, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,999
total depth, ft
2
permits on file
Jan 27, 2010
last permit issued
Nov 12, 2008
completed
258K
cumulative oil, bbl
176K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 12, 2008
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 18 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lavelle-Smith Unit O-8-28847Lake Coleman (Morris 2750)Pony Express Corporate Trust17241K72.2KSep 2000 – Jul 2026
Lavelle O-8-30641Emily (Ellenburger)Pony Express Corporate Trust116.4K104KApr 2010 – Jul 2026

Oil, barrels lease total

Last 12 months 1 · prior 12 30(-97%)

0100200202420252026

Gas, mcf lease total

Last 12 months 771 · prior 12 508(+52%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Encon Services, Inc.Sep 2000 → May 2011
  2. 2Contour Oil & Gas, LLCJun 2011 → Nov 2015
  3. 3D.J. & T. EnergyDec 2015 → Mar 2023
  4. 4Pony Express Corporate TrustApr 2023 → May 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
690257-99RecompletionEncon Services, Inc.Jan 25, 2010Jan 27, 2010Apr 1, 20104,999
668461-99DrillEncon Services, Inc.Aug 6, 2008Aug 27, 2008Oct 26, 20084,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-28847————
—— O-8-30641————

Formation tops

As filed on W-2/G-1. Subsea from 1,774 ft elevation.Download CSV →

FormationMD ftSubsea
Morris2,754-980
Gardner3,074-1,300
Gray3,262-1,488
Caddo3,372-1,598
Barnett3,868-2,094

Perforations

Perforated and open-hole intervals.

FromToType
2,7452,765Perforated
3,9823,997Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62512712.2575 S
72,7498.75405 S
4.53,9826.125175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 16, 2011Sep 29, 2010Yes
00Apr 8, 2009Dec 23, 2008Yes
00Feb 19, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08335779, documented in the API reference.