WELL · 42-083-35915 · DISTRICT 7
Leonard James #3
Coleman County · Coleman County Regular field · Shut IN · Vertical
Leonard James #3 (API 42-083-35915) is a well in Coleman County operated by Seven Cross Operating LLC, completed May 22, 2011 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued May 13, 2011, permitted to 2,000 ft.
It was permitted by Petro 2000 Exploration CO. and has since transferred to Seven Cross Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Crosscut, Breneke, Fry.
Its lease has reported 32.4K barrels of oil since March 2011, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Petro 2000 Exploration Co.; the EWA schedule now lists a different operator.
Santa Anna, TX · P-5 Y, filed Jan 5, 2026 · 4 permits on file · (325) 200-1020
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seven Cross Operating LLC |
| Production reports | Seven Cross Operating, LLCthrough Jul 2024 |
| Latest permit | Petro 2000 Exploration Co.May 13, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- May 13, 2011
- last permit issued
- May 22, 2011
- completed
- 32.4K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 22, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Leonard, James O-8-30766 | Coleman County Regular | Seven Cross Operating, LLC | 7 | 32.4K | 0 | Mar 2011 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 43(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Petro 2000 Exploration Co.Apr 2011 → Nov 2011
- 2Adino ExplorationDec 2011 → Sep 2012
- 3Broadway Petroleum Company, LLCOct 2012 → Jan 2018
- 4Seven Cross Operating, LLCMar 2018 → Jul 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 716113-99 | Drill | Petro 2000 Exploration Co. | May 11, 2011 | May 13, 2011 | May 17, 2011 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-30766 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,162 | 1,166 | Perforated |
| 1,172 | 1,177 | Perforated |
| 1,182 | 1,190 | Perforated |
| 1,196 | 1,200 | Perforated |
| 1,212 | 1,215 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,250 | 6.75 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 13, 2012 | Oct 27, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-35915 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-35915 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08335915, documented in the API reference.