WELL · 42-089-00057 · DISTRICT 3
Cullen, H. R. et AL #2
Colorado County · Vertical
Cullen, H. R. ET AL #2 (API 42-089-00057) is a former disposal or injection well in Colorado County, last operated by Quintana Pet. Corp.; its UIC permit is no longer active.
The RRC has issued 5 drilling permits (amended once) between 1978 and 1997, permitted to 10,195 ft.
Completion filings report 4 formation tops, including 7-C, 10-A, 11-A, 12-A.
Its 4 leases have reported 238K barrels of oil and 615K mcf of gas since January 1993, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.
Operator of record
Refugio, TX · P-5 Y, filed Jun 9, 2000 · 1,589 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Strand Energy, L.C.through Apr 2026 |
| Latest permit | Quintana Pet. Corp.Oct 9, 1997 |
- 10,195
- total depth, ft
- 6
- permits on file
- Oct 9, 1997
- last permit issued
- —
- completed
- 238K
- cumulative oil, bbl
- 615K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cullen, H.R. et AL O-3-24058 | Columbus (Consolidated) | Strand Energy, L.C. | 5 | 92.5K | 335K | Sep 2001 – Jul 2026 |
| Cullen, H.R. et AL O-3-12032 | Columbus (7050) | Hilcorp Energy Company | 2 | 116K | 219K | Jan 1993 – Dec 2001 |
| Cullen, H. R. et AL O-3-23383 | Columbus (7150) | Hilcorp Energy Company | 1 | 29.7K | 60.4K | Nov 1997 – Oct 2001 |
| Cullen, H. R. et AL G-3-127393 | Columbus ( 5-G Wilcox) | Hilcorp Energy Company | 1 | 0 | 0 | Jan 1993 – Apr 2001 |
Gas, mcf lease total
Last 12 months 27,149 · prior 12 26,366(+3%)
Oil, barrels lease total
Last 12 months 3,717 · prior 12 3,752(-1%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Quintana Pet. Corp.Jan 1993 → Nov 2000
- 2Hilcorp Energy CompanyDec 2000 → Sep 2006
- 3Goldking Operating Company, Inc.Oct 2006 → May 2007
- 4Dune Operating CompanyJun 2007 → Jul 2015
- 5Gordy Oil CompanyAug 2015 → Aug 2016
- 6Strand Energy, L.C.Sep 2016 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 468248-98 | Recompletion | Quintana Pet. Corp. | Nov 12, 1997 | Oct 9, 1997 | Oct 21, 1997 | 10,195 |
| 468248-99 | Recompletion | Quintana Pet. Corp. | Oct 1, 1997 | Oct 9, 1997 | — | 10,195 |
| 344019-99 | Recompletion | Quintana Pet. Corp. | Mar 17, 1988 | Mar 17, 1988 | — | 10,195 |
| 343657-99 | Recompletion | Quintana Pet. Corp. | Mar 9, 1988 | Mar 9, 1988 | — | 10,195 |
| 242875-99 | Recompletion | Quintana Pet. Corp. | Jun 18, 1984 | Jun 22, 1984 | — | 10,195 |
| 30584-99 | Recompletion | Quintana Pet. Corp. | Aug 14, 1978 | Aug 14, 1978 | — | 10,195 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-127393 | — | — | — | — |
| — | — O-3-12032 | — | — | — | — |
| — | — O-3-23383 | — | — | — | — |
| — | — O-3-24058 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 250 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 7-C | 8,313 | -8,063 |
| 10-A | 9,060 | -8,810 |
| 11-A | 9,263 | -9,013 |
| 12-A | 9,600 | -9,350 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,874 | 3,880 | Perforated |
| 7,060 | 7,070 | Perforated |
| 7,144 | 7,152 | Perforated |
| 7,420 | 7,432 | Perforated |
| 9,351 | 9,400 | Perforated |
| 9,542 | 9,562 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,553 | 12.25 | 1,275 S |
| 2.375 | 9,408 | — | — |
| 7 | 9,700 | 9.875 | 700 S |
| 7 | 9,701 | 9.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 12, 2001 | Jul 12, 2001 | — |
| 00 | Oct 9, 2001 | Aug 7, 2001 | — |
| 00 | Sep 20, 2001 | Aug 7, 2001 | — |
| 00 | Mar 6, 1998 | Dec 15, 1997 | Yes |
| 00 | Jan 29, 1998 | — | — |
| 00 | Jun 20, 1988 | Jun 2, 1988 | Yes |
| 00 | Jun 13, 1988 | Jul 19, 1984 | — |
| 00 | Jun 11, 1988 | — | — |
| 00 | Aug 10, 1984 | Jul 19, 1984 | Yes |
| 00 | Aug 7, 1984 | Jul 19, 1984 | — |
| 00 | Jan 12, 1984 | Aug 31, 1978 | — |
| 00 | Jan 12, 1984 | Aug 25, 1969 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-00057 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-00057 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- May 2023
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000115699 | W-14 Disposal | Plugged Apr 15, 2025 | 2,000 | 1,900 | 3,874–4,670 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08900057, documented in the API reference.