WELL · 42-089-00944 · DISTRICT 3

Sheridan Gas Unit #61

Plugged

Colorado County · Sheridan (Wilcox -H-) field  · Vertical

Sheridan Gas Unit #61 (API 42-089-00944) is a plugged well in Colorado County, plugged January 30, 2012, last operated by Copano Processing L.P..

The RRC has issued one drilling permit, issued May 13, 1985, permitted to 14,700 ft.

It was permitted by Shell Western E&P Inc. and has since transferred to Copano Processing L.P. on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

Operator of record

Copano Processing L.P.

Permitted by Shell Western E&P Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jul 2, 2015 · 2 permits on file · (855) 737-9555

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCopano Processing L.P.
Production reportsnone
Latest permitShell Western E&P Inc.May 13, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,700
total depth, ft
1
permits on file
May 13, 1985
last permit issued
Apr 4, 1998
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 4, 1998
Shut in
—
Plugged
Jan 30, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sheridan Gas Unit G-3-117296Sheridan (Wilcox -H-)Copano Processing, L.P.100Jan 1993 – Jan 2012

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
274786-99RecompletionShell Western E&P Inc.May 3, 1985May 13, 1985—14,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-117296————

Formation tops

As filed on W-2/G-1. Subsea from 244 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxWILCOX A8,038-7,794
WilcoxWILCOX C8,415-8,171
WilcoxWILCOX D8,662-8,418
WilcoxWILCOX E8,756-8,512
WilcoxWILCOX H9,014-8,770
WilcoxWILCOX L9,310-9,066

Perforations

Perforated and open-hole intervals.

FromToType
2,8952,920Perforated
2,9552,980Perforated
3,0403,064Perforated
3,1403,193Perforated
3,3823,420Perforated
3,4583,510Perforated
9,0269,042Perforated
10,54810,800Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,27113.25600 S
10.752,27115600 S
7.62512,1309.875991 S
7.62512,1809.875991 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 21, 2003Mar 5, 2003—
00May 12, 1999Apr 5, 1999—
00Sep 14, 1998Jun 22, 1998—
00May 18, 1992May 4, 1992—
00Aug 21, 1985Jul 22, 1985—
00Aug 1, 1985——
00Jan 12, 1984Feb 1, 1968—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

6K
bbl, last 12 reported months
5.51M
bbl, all reported
May 2011
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000076352H-1 InjectionPlugged Feb 2, 20128,0001,4452,890–3,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 6,003 · prior 12 16,576(-64%)

02K4K6K20102011

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08900944, documented in the API reference.