WELL · 42-089-30874 · DISTRICT 3

Sheridan Gas Unit #74

Y

Colorado County · Sheridan (Wilcox Consolidated) field · Injection  · Vertical

Sheridan Gas Unit #74 (API 42-089-30874) is a well in Colorado County operated by Remora Management LLC, completed August 4, 2011 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued July 5, 1977, permitted to 11,000 ft.

It was permitted by Shell Oil Company and has since transferred to Remora Management LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Vicksburg, Yegua, Wilcox.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 58.4K barrels injected in the 12 months reported through December 2025.

Operator of record

Remora Management LLC

Permitted by Shell Oil Company; the EWA schedule now lists a different operator.

The Woodlands, TX · P-5 Y, filed Jan 5, 2026 · 71 permits on file · (713) 303-8265

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRemora Management LLC
Production reportsnone
Latest permitShell Oil CompanyJul 5, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
1
permits on file
Jul 5, 1977
last permit issued
Aug 4, 2011
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 4, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sheridan Gas Unit G-3-74775Sheridan (Wilcox Consolidated)Remora Management, LLC100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
2289-99DrillShell Oil CompanyJul 5, 1977Jul 5, 1977Dec 18, 197711,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-74775————

Formation tops

As filed on W-2/G-1. Subsea from 203 ft elevation.Download CSV →

FormationMD ftSubsea
Vicksburg3,580-3,377
Yegua4,920-4,717
WilcoxTOP OF WILCOX7,928-7,725

Perforations

Perforated and open-hole intervals.

FromToType
3,5243,559Perforated
3,7183,776Perforated
3,8113,819Perforated
3,8113,874Perforated
3,8333,839Perforated
3,8463,860Perforated
3,8673,874Perforated
10,13010,152Perforated
10,19410,255Perforated
10,19410,340Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,01214.751,020 S
2.37510,115——
5.510,7559.8751,450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 2, 2015May 30, 2014—
00Jan 7, 2015May 30, 2014—
00Jan 10, 2011May 13, 2010—
00Mar 1, 2010Jul 24, 2009—
00Dec 12, 2001Nov 2, 2001—
00Jan 12, 1984Jan 20, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

58.4K
bbl, last 12 reported months
1.69M
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000100663H-1 InjectionActive5,0001,4002,900–3,900

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 58,362 · prior 12 57,709(+1%)

02K4K6K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08930874, documented in the API reference.