WELL · 42-089-31374 · DISTRICT 3
Gordon Tulane #2
Colorado County · Chesterville SE. (3770) field · Vertical
Gordon Tulane #2 (API 42-089-31374) is a plugged well in Colorado County, plugged May 13, 1998, last operated by Howard Exploration Inc..
The RRC has issued 2 drilling permits between 1983 and 1997, permitted to 4,200 ft.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Operator of record
Houston, TX · P-5 Y, filed Jun 4, 2026 · 113 permits on file · (281) 477-9200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Howard Exploration Inc. |
| Production reports | none |
| Latest permit | Howard Exploration, Inc.Aug 12, 1997 |
- 4,200
- total depth, ft
- 2
- permits on file
- Aug 12, 1997
- last permit issued
- Mar 18, 1983
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 18, 1983
- Shut in
- —
- Plugged
- May 13, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gordon, Tulane G-3-164297 | Chesterville, SE. (2100 Sand) | Howard Exploration, Inc. | 1 | 0 | 0 | Aug 1997 – May 1998 |
| Gordon, Tulane G-3-105319 | Chesterville, SE. (3770) | Howard Exploration, Inc. | 1 | 0 | 0 | Jan 1993 – Aug 1997 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 466145-99 | Recompletion | Howard Exploration, Inc. | Aug 12, 1997 | Aug 12, 1997 | Aug 16, 1997 | 4,000 |
| 186967-99 | Drill | Heritage Operating Co., Inc. The | Feb 25, 1983 | Feb 25, 1983 | — | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-105319 | — | — | — | — |
| — | — G-3-164297 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 149 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1,900 | -1,751 |
| Miocene (undifferentiated)MIOCENE | 2,100 | -1,951 |
| Frio | 3,750 | -3,601 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,193 | 2,197 | Perforated |
| 3,776 | 3,780 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 632 | 12.25 | 305 S |
| 2.375 | 4,015 | — | — |
| 4.5 | 4,065 | 7.875 | 900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 7, 1997 | Sep 10, 1997 | Yes |
| 00 | Sep 16, 1997 | — | — |
| 00 | Oct 31, 1989 | Sep 22, 1989 | — |
| 00 | Jan 12, 1984 | Apr 18, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-31374 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-31374 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 209K
- bbl, all reported
- Dec 1997
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000070700 | H-1 Injection | Plugged Jun 16, 1998 | 500 | 500 | 3,768–3,800 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08931374, documented in the API reference.