WELL · 42-089-31855 · DISTRICT 3
Raley Bobby R. et UX #1
Colorado County · Englehart SE. (Wilcox 9260) field · Vertical
Raley Bobby R. ET UX #1 (API 42-089-31855) is a plugged well in Colorado County, plugged September 22, 1997, last operated by Magnum Producing & Operating CO..
The RRC has issued 2 drilling permits between 1992 and 1995, permitted to 10,000 ft.
Completion filings report 3 formation tops, including Frio, Yegua, Wilcox.
Operator of record
Magnum Producing & Operating Co.
Corpus Chrsti, TX · P-5 Inactive, filed Jan 29, 2003 · 173 permits on file · (361) 882-3858
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Magnum Producing & Operating Co. |
| Production reports | Magnum Producing & Operating Co.through Jun 1996 |
| Latest permit | Magnum Producing & Operating Co.Dec 20, 1995 |
- 10,000
- total depth, ft
- 2
- permits on file
- Dec 20, 1995
- last permit issued
- Sep 3, 1992
- completed
- 0
- cumulative oil, bbl
- 186K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 3, 1992
- Shut in
- —
- Plugged
- Sep 22, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Raley, Bobby R. et UX GU G-3-156617 | Englehart (6700) | Magnum Producing & Operating Co. | 1 | 0 | 54.1K | Nov 1995 – Sep 1997 |
| Raley, Bobby R. et UX G-3-144777 | Englehart, SE. (Wilcox 9260) | Magnum Producing & Operating Co. | 1 | 0 | 132K | Jan 1993 – Feb 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1North Central Oil Corp.Feb 1993 → Jun 1994
- 2Magnum Producing & Operating Co.Jul 1994 → Jun 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 442869-99 | Recompletion | Magnum Producing & Operating Co. | Dec 15, 1995 | Dec 20, 1995 | Nov 15, 1995 | 6,840 |
| 401257-99 | Drill | North Central Oil Corp. | Jul 16, 1992 | Jul 21, 1992 | Aug 8, 1992 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-144777 | — | — | — | — |
| — | — G-3-156617 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 162 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,704 | 6,709 | Perforated |
| 9,262 | 9,272 | Perforated |
| 9,279 | 9,295 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,858 | 12.25 | 640 S |
| 5.5 | 9,802 | 8.75 | 1,525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 31, 1996 | Dec 14, 1995 | Yes |
| 00 | Jan 16, 1996 | — | — |
| 00 | May 5, 1993 | Feb 22, 1993 | Yes |
| 00 | Apr 23, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-31855 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-31855 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08931855, documented in the API reference.