WELL · 42-089-31939 · DISTRICT 3

Hawthorne, Clifford M. #2

N

Colorado County  · Vertical

Hawthorne, Clifford M. #2 (API 42-089-31939) is a permitted well in Colorado County filed by Shana Petroleum Company; no completion report is on file yet.

The RRC has issued 6 drilling permits between 1995 and 2001, permitted to 11,500 ft.

Completion filings report 3 formation tops, including Wilcox, Upr. Wilcox, Lwr. Wilcox.

Operator of record

Shana Petroleum Company

Dallas, TX · P-5 Y, filed May 3, 2002 · 208 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsNeg Operating LLCthrough Feb 2003
Latest permitShana Petroleum CompanyAug 6, 2001
11,500
total depth, ft
6
permits on file
Aug 6, 2001
last permit issued
—
completed
0
cumulative oil, bbl
625K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Feb 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hawthorne, Clifford M. G-3-180600Paul (LW-20)Neg Operating LLC1036KAug 2000 – Feb 2004
Hawthorne, Clifford M. G-3-173927Paul (LW-22)Neg Operating LLC10176KJul 1999 – Aug 2003
Hawthorne, Clifford M. G-3-166815Paul (LW-27)Shana Petroleum Company10184KJan 1998 – Sep 1999
Hawthorne, Clifford M. G-3-160041Paul (LW-30)Shana Petroleum Company10175KJul 1996 – Apr 1998
Hawthorne, Clifford M. G-3-156529Paul (LW-54)Shana Petroleum Company1053.6KOct 1995 – Jan 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shana Petroleum CompanyNov 1995 → Apr 2002
  2. 2Neg Operating LLCMay 2002 → Feb 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
512255-99RecompletionShana Petroleum CompanyAug 6, 2001Aug 6, 2001—9,455
496353-99RecompletionShana Petroleum CompanyJun 20, 2000Jun 28, 2000Aug 11, 20009,455
475342-99RecompletionShana Petroleum CompanyApr 15, 1998Apr 15, 1998Jul 9, 19999,660
470652-99RecompletionShana Petroleum CompanyDec 1, 1997Dec 2, 1997Dec 31, 199710,366
447456-99RecompletionShana Petroleum CompanyApr 25, 1996Jun 28, 1996Jul 22, 199610,860
437449-99DrillShana Petroleum CompanyJun 30, 1995Aug 1, 1995Aug 10, 199511,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-156529————
—— G-3-160041————
—— G-3-166815————
—— G-3-173927————
—— G-3-180600————

Formation tops

As filed on W-2/G-1. Subsea from 293 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxUPPER WILCOX7,200-6,907
Upr. Wilcox7,200-6,907
WilcoxMIDDLE WILCOX8,130-7,837
WilcoxLOWER WILCOX8,910-8,617
Lwr. Wilcox8,910-8,617

Perforations

Perforated and open-hole intervals.

FromToType
9,4429,450Perforated
9,4919,493Perforated
9,5029,507Perforated
9,6969,700Perforated
9,7419,751Perforated
10,39010,397Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,04812.25550 S
4.511,1868.75670 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 22, 2001Mar 12, 2001—
00Apr 2, 2001Dec 27, 2000Yes
00Feb 7, 2001——
00Mar 15, 2000Feb 11, 2000—
00Sep 7, 1999Jul 30, 1999Yes
00Aug 30, 1999——
00Apr 3, 1998Feb 12, 1998Yes
00Mar 9, 1998——
00Oct 10, 1996Aug 22, 1996Yes
00Oct 8, 1996——
00Jan 29, 1996Nov 10, 1995Yes
00Jan 10, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08931939, documented in the API reference.