WELL · 42-089-31951 · DISTRICT 3
Carey Unit #3
Colorado County · Vertical
Carey Unit #3 (API 42-089-31951) is a permitted well in Colorado County filed by Lone Oak Energy Inc; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1995 and 2010, permitted to 10,650 ft.
Completion filings report 3 formation tops, including Frio, Yegua, Wilcox.
Operator of record
Kyle, TX · P-5 Y, filed Feb 4, 2026 · 25 permits on file · (512) 750-0038
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Lone Oak Energy Incthrough Jun 2012 |
| Latest permit | Lone Oak Energy IncDec 23, 2010 |
- 10,650
- total depth, ft
- 2
- permits on file
- Dec 23, 2010
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 337K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carey Unit G-3-159428 | B.A.D.A. (10,340 Sd.) | Lone Oak Energy Inc | 1 | 0 | 337K | Jun 1996 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Santos USA Corp.Jul 1996 → Jan 1999
- 2Caskids Operating CompanyFeb 1999 → Jul 1999
- 3Stanford Petroleum IncFeb 2001 → Feb 2001
- 4Lone Oak Energy IncOct 2004 → Jun 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 707339-99 | Recompletion | Lone Oak Energy Inc | Dec 20, 2010 | Dec 23, 2010 | — | 10,650 |
| 441004-99 | Drill | Santos USA Corp. | Oct 18, 1995 | Oct 18, 1995 | Dec 7, 1995 | 10,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-159428 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,333 | 10,380 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,764 | 12.25 | 410 S |
| 5.5 | 10,650 | 8.75 | 780 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 30, 1996 | Aug 4, 1996 | Yes |
| 00 | Aug 23, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-31951 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-31951 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08931951, documented in the API reference.