WELL · 42-089-31988 · DISTRICT 3
Kallina #1
Colorado County · Garwood S.E. (Y-2) field · Vertical
Kallina #1 (API 42-089-31988) is a well in Colorado County operated by Sue-Ann Operating L.C., completed February 19, 2004.
The RRC has issued one drilling permit (amended once), issued July 17, 1996, permitted to 6,600 ft.
It was permitted by Lomak Production Company and has since transferred to Sue-Ann Operating L.C. on the wellbore schedule.
Completion filings report 6 formation tops, including Miocene (undifferentiated), Frio, Brown, Y-1 (Dy).
Its lease has reported 6.58K barrels of oil and 4.01K mcf of gas since November 1996, last reporting in August 2012.
Operator of record
Permitted by Lomak Production Company; the EWA schedule now lists a different operator.
Victoria, TX · P-5 Y, filed Mar 4, 2026 · 380 permits on file · (361) 550-4479
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sue-Ann Operating L.C. |
| Production reports | Lomak Production Companythrough Feb 1998 |
| Latest permit | Lomak Production CompanyJul 17, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,600
- total depth, ft
- 2
- permits on file
- Jul 17, 1996
- last permit issued
- Feb 19, 2004
- completed
- 6.58K
- cumulative oil, bbl
- 4.01K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1996 THROUGH Aug 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 19, 2004
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kallina O-3-23156 | Garwood, S.E. (Y-2) | Sue-Ann Operating, L.C. | 1 | 6.58K | 4.01K | Nov 1996 – Aug 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lomak Production CompanyNov 1996 → Dec 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 450441-98 | Drill | Lomak Production Company | Aug 26, 1996 | Jul 17, 1996 | Oct 29, 1996 | 6,600 |
| 450441-99 | Drill | Lomak Production Company | Jul 17, 1996 | Jul 17, 1996 | — | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-23156 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 157 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 2,100 | -1,943 |
| Frio | 3,400 | -3,243 |
| Brown | 5,800 | -5,643 |
| Y-1 (DY) | 5,900 | -5,743 |
| Y+2A | 6,100 | -5,943 |
| Y-3 | 6,300 | -6,143 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,294 | 2,304 | Perforated |
| 2,366 | 2,376 | Perforated |
| 5,981 | 5,984 | Perforated |
| 5,982 | 5,985 | Perforated |
| 6,013 | 6,023 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 728 | 12.25 | 260 S |
| 5.5 | 6,505 | 7.875 | 158 S |
| 5.5 | — | — | 276 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 21, 2004 | Mar 16, 2004 | — |
| 00 | Apr 21, 2003 | Mar 13, 2003 | — |
| 00 | Mar 6, 1997 | Nov 18, 1996 | Yes |
| 00 | Feb 26, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-31988 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-31988 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 148K
- bbl, all reported
- May 2013
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000092178 | H-1 Injection | Plugged Aug 15, 2012 | 1,000 | 900 | 2,250–6,500 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08931988, documented in the API reference.