WELL · 42-089-32046 · DISTRICT 3
Cason #1
Colorado County · Thomas (2250) field · Vertical
Cason #1 (API 42-089-32046) is a plugged well in Colorado County, plugged March 24, 2003, last operated by Hilcorp Energy Company.
The RRC has issued 2 drilling permits (amended twice) between 1997 and 2000, permitted to 5,300 ft.
Completion filings report one formation top, including Frio.
Operator of record
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Mar 2003 |
| Latest permit | Hilcorp Energy CompanyJun 16, 2000 |
- 5,300
- total depth, ft
- 4
- permits on file
- Jun 16, 2000
- last permit issued
- Oct 23, 2001
- completed
- 0
- cumulative oil, bbl
- 521K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1997 THROUGH Mar 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 23, 2001
- Shut in
- —
- Plugged
- Mar 24, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cason G-3-185962 | Thomas (2250) | Hilcorp Energy Company | 1 | 0 | 10.8K | Oct 2001 – Mar 2003 |
| Cason G-3-164273 | Matthews, SE (Frio 4300) | Hilcorp Energy Company | 1 | 0 | 510K | Aug 1997 – Oct 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hilcorp Energy CompanyAug 1997 → Mar 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 496275-98 | Recompletion | Hilcorp Energy Company | Oct 24, 2001 | Jun 16, 2000 | Oct 22, 2001 | 4,197 |
| 496275-99 | Recompletion | Hilcorp Energy Company | Jun 16, 2000 | Jun 16, 2000 | — | 4,270 |
| 462583-98 | Drill | Hilcorp Energy Company | Aug 26, 1997 | May 22, 1997 | — | 5,300 |
| 462583-99 | Drill | Cody Energy, Inc. | May 19, 1997 | May 22, 1997 | Aug 2, 1997 | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-164273 | — | — | — | — |
| — | — G-3-185962 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 10 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| FrioFRIO 4300 | 4,291 | -4,281 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,314 | 2,318 | Perforated |
| 4,198 | 4,201 | Perforated |
| 4,271 | 4,274 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,014 | 12.25 | 268 S |
| 2.875 | 5,155 | 8.625 | 1,307 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 27, 2001 | Nov 21, 2001 | Yes |
| 00 | Dec 12, 2001 | — | — |
| 00 | Sep 26, 2000 | Jul 7, 2000 | — |
| 00 | Sep 26, 1997 | Sep 9, 1997 | Yes |
| 00 | Sep 15, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-32046 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-32046 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08932046, documented in the API reference.