WELL · 42-089-32133 · DISTRICT 3
Stovall #1
Colorado County · Nada (Frio 4100) field · Temp Abandoned · Vertical
Stovall #1 (API 42-089-32133) is a well in Colorado County operated by Mosaic Oil LLC, completed May 25, 1999 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued April 21, 1999, permitted to 5,000 ft.
It was permitted by Camoil, Inc. and has since transferred to Mosaic Oil LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Miocene (undifferentiated), Catahoula, Frio.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Camoil, Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Sep 4, 2025 · (432) 250-0250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mosaic Oil LLC |
| Production reports | Camoil, Inc.through Oct 2011 |
| Latest permit | Camoil, Inc.Apr 21, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 1
- permits on file
- Apr 21, 1999
- last permit issued
- May 25, 1999
- completed
- 0
- cumulative oil, bbl
- 279K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 25, 1999
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stovall G-3-173470 | Nada (Frio 4100) | Mosaic Oil LLC | 1 | 0 | 279K | May 1999 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Camoil, Inc.Aug 1999 → Oct 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 483994-99 | Drill | Camoil, Inc. | Apr 21, 1999 | Apr 21, 1999 | Apr 27, 1999 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-173470 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 161 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)TOP MIOCENE | 1,000 | -839 |
| CatahoulaTOP CATAHOULA | 2,770 | -2,609 |
| FrioTOP FRIO | 3,300 | -3,139 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,088 | 4,090 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 471 | 12.25 | — |
| 2.875 | 4,150 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 22, 1999 | Jun 28, 1999 | Yes |
| 00 | Jul 14, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-32133 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-32133 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08932133, documented in the API reference.