WELL · 42-089-32305 · DISTRICT 3
Hughes #1
Colorado County · Wharco Shilling (Frio 3900) field · Vertical
Hughes #1 (API 42-089-32305) is a plugged well in Colorado County, plugged October 1, 2004, last operated by American Energy Partners Inc..
The RRC has issued 2 drilling permits between 2001 and 2004, permitted to 4,710 ft.
It was permitted by Wagner Oil Company and has since transferred to American Energy Partners Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Catahoula, Frio.
Operator of record
Permitted by Wagner Oil Company; the EWA schedule now lists a different operator.
Boerne, TX · P-5 Y, filed Oct 7, 2011 · 52 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | American Energy Partners Inc. |
| Production reports | Wagner Oil Companythrough Nov 2003 |
| Latest permit | Wagner Oil CompanyJan 16, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,710
- total depth, ft
- 2
- permits on file
- Jan 16, 2004
- last permit issued
- Oct 23, 2001
- completed
- 0
- cumulative oil, bbl
- 116K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2001 THROUGH Sep 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 23, 2001
- Shut in
- —
- Plugged
- Oct 1, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hughes G-3-186984 | Wharco Shilling (Frio 3900) | American Energy Partners, Inc. | 1 | 0 | 116K | Oct 2001 – Sep 2004 |
| Hughes G-3-199315 | Wildcat | Wagner Oil Company | 1 | 0 | 0 | Dec 2003 – Sep 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wagner Oil CompanyNov 2001 → Nov 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 540788-99 | Recompletion | Wagner Oil Company | Jan 15, 2004 | Jan 16, 2004 | Dec 21, 2003 | 4,710 |
| 512449-99 | Drill | Wagner Oil Company | Aug 10, 2001 | Aug 13, 2001 | Oct 3, 2001 | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-186984 | — | — | — | — |
| — | — G-3-199315 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 133 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,036 | 3,040 | Perforated |
| 3,913 | 3,916 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 486 | 12.25 | 320 S |
| 8.625 | 486 | 12.5 | 320 S |
| 2.875 | 4,682 | 7.875 | 865 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 19, 2004 | Jan 30, 2004 | Yes |
| 00 | Feb 26, 2004 | — | — |
| 00 | Mar 13, 2002 | Dec 5, 2001 | Yes |
| 00 | Feb 26, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-32305 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-32305 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08932305, documented in the API reference.