WELL · 42-089-32566 · DISTRICT 3
Sheridan Gas Unit #130
Colorado County · Sheridan (Wilcox Consolidated) field · Temp Abandoned · Vertical
Sheridan Gas Unit #130 (API 42-089-32566) is a well in Colorado County operated by Remora Management LLC, completed February 15, 2020 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued February 22, 2008, permitted to 12,500 ft.
It was permitted by Xto Energy Inc. and has since transferred to Remora Management LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Yegua, Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.
The Woodlands, TX · P-5 Active, filed Mar 10, 2026 · 71 permits on file · (281) 203-3568
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Remora Management LLC |
| Production reports | XTO Energy Inc.through Feb 2020 |
| Latest permit | XTO Energy Inc.Feb 22, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 1
- permits on file
- Feb 22, 2008
- last permit issued
- Feb 15, 2020
- completed
- 0
- cumulative oil, bbl
- 527K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 15, 2020
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sheridan Gas Unit G-3-242353 | Sheridan (Wilcox T) | Remora Management, LLC | 1 | 0 | 527K | Jun 2008 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XTO Energy Inc.Jun 2008 → Feb 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 655242-99 | Drill | XTO Energy Inc. | Feb 13, 2008 | Feb 22, 2008 | May 31, 2008 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-242353 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 229 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,832 | 9,842 | Perforated |
| 10,453 | 10,478 | Perforated |
| 10,948 | 10,960 | Perforated |
| 11,094 | 11,175 | Perforated |
| 11,377 | 11,400 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,020 | 12.25 | 666 S |
| 4.5 | 11,788 | 8.5 | 1,559 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 22, 2020 | Jun 10, 2020 | — |
| 00 | Oct 26, 2009 | Aug 26, 2009 | — |
| 00 | May 4, 2009 | Jan 21, 2009 | — |
| 00 | Dec 8, 2008 | Jul 30, 2008 | Yes |
| 00 | Nov 24, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-32566 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-32566 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08932566, documented in the API reference.