WELL · 42-089-32649 · DISTRICT 3
Heffley #2
Colorado County · Caballo (Prairie Bell) field · Vertical
Heffley #2 (API 42-089-32649) is a plugged well in Colorado County, plugged November 8, 2013, last operated by C & E Operating Inc..
The RRC has issued one drilling permit (amended once), issued December 8, 2010, permitted to 13,000 ft.
Completion filings report one formation top, including Wilcox.
Operator of record
Hockley, TX · P-5 Y, filed Jun 2, 2023 · 462 permits on file · (281) 265-6500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | C & E Operating Inc. |
| Production reports | C & E Operating, Inc.through Jul 2013 |
| Latest permit | C & E Operating, Inc.Dec 8, 2010 |
- 13,000
- total depth, ft
- 2
- permits on file
- Dec 8, 2010
- last permit issued
- Feb 10, 2011
- completed
- 0
- cumulative oil, bbl
- 126K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2011 THROUGH Nov 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 10, 2011
- Shut in
- —
- Plugged
- Nov 8, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Heffley G-3-262305 | Caballo (Prairie Bell) | C & E Operating, Inc. | 1 | 0 | 126K | Feb 2011 – Nov 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1C & E Operating, Inc.Mar 2011 → Jul 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 706430-98 | Drill | C & E Operating, Inc. | Mar 2, 2011 | Dec 8, 2010 | Dec 23, 2010 | 13,000 |
| 706430-99 | Drill | C & E Operating, Inc. | Dec 6, 2010 | Dec 8, 2010 | Dec 23, 2010 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-262305 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,348 | 11,351 | Perforated |
| 11,502 | 11,505 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,497 | 12.25 | 824 S |
| 4.5 | 11,745 | 8.75 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 27, 2012 | May 12, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-32649 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-32649 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08932649, documented in the API reference.