WELL · 42-093-31569 · DISTRICT 7
Abby #1
Comanche County · Mittie (Marble Falls) field · Producing · Vertical
Abby #1 (API 42-093-31569) is a well in Comanche County operated by Mission Energy Inc., completed August 31, 2012 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued May 21, 2012, permitted to 4,000 ft.
It was permitted by Minuteman Energy, LLC and has since transferred to Mission Energy Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Caddo, Marble Falls.
Its lease has reported 1.63K barrels of oil and 55.1K mcf of gas since August 2012, last reporting in July 2026.
Operator of record
Permitted by Minuteman Energy, LLC; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Jan 5, 2026 · 2 permits on file · (432) 413-4864
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mission Energy Inc. |
| Production reports | Mission Energy Inc.through Jan 2026 |
| Latest permit | Minuteman Energy, LLCMay 21, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- May 21, 2012
- last permit issued
- Aug 31, 2012
- completed
- 1.63K
- cumulative oil, bbl
- 55.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 31, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Abby O-8-31142 | Mittie (Marble Falls) | Mission Energy Inc. | 1 | 1.63K | 55.1K | Aug 2012 – Jul 2026 |
Gas, mcf lease total
Last 12 months 4,327 · prior 12 5,743(-25%)
Oil, barrels lease total
Last 12 months 91 · prior 12 58(+57%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Minuteman Energy, LLCAug 2012 → Jan 2015
- 2Transcontinental Shale L.L.C.Mar 2015 → May 2015
- 3DMV Pipeline LLCAug 2017 → Feb 2020
- 4Mission Energy Inc.Jul 2021 → Jan 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 739029-99 | Drill | Minuteman Energy, LLC | Apr 25, 2012 | May 21, 2012 | Jul 23, 2012 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-31142 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,734 | 2,744 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 265 | 11 | 115 S |
| 4.5 | 2,923 | 7.875 | 165 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 25, 2013 | Sep 5, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-093-31569 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-093-31569 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09331569, documented in the API reference.