WELL · 42-095-30050 · DISTRICT 7

Carter R. L. #10

N

Concho County · Millersview W. (Cross Cut SD) field  · Vertical

Carter R. L. #10 (API 42-095-30050) is a well in Concho County operated by Willowbend Investments Inc., completed November 29, 2007.

The RRC has issued one drilling permit, issued August 16, 2006, permitted to 3,000 ft.

It was permitted by Swartz Oil Company and has since transferred to Willowbend Investments Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including B Palo Pinto, B. Palo Pinto Lime, Cross Cut Sand, Cross Cut Sd.

Its 2 leases have reported 2.13K barrels of oil and 19.1K mcf of gas since February 2006, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Willowbend Investments Inc.

Permitted by Swartz Oil Company; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Jul 4, 2026 · 162 permits on file · (940) 781-2358

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWillowbend Investments Inc.
Production reportsO'Dell, Mitchellthrough Apr 2026
Latest permitSwartz Oil CompanyAug 16, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
1
permits on file
Aug 16, 2006
last permit issued
Nov 29, 2007
completed
2.13K
cumulative oil, bbl
19.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 29, 2007
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carter, R. L. G-9-279517Millersview, W. (Cross Cut SD)O'Dell, Mitchell10431Mar 2014 – Jul 2026
Carter, R. L. O-9-15950Millersview, W. (Cross Cut SD)Willowbend Investments, Inc.22.13K18.7KFeb 2006 – Dec 2016

Gas, mcf lease total

Last 12 months 12 · prior 12 12(+0%)

01202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Swartz Oil CompanyJul 2006 → Jul 2008
  2. 2Willowbend Investments, Inc.Aug 2008 → May 2017
  3. 3O'Dell, MitchellJul 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
623641-99ReenterSwartz Oil CompanyAug 1, 2006Aug 16, 2006Feb 12, 20073,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-279517————
—— O-9-15950————

Formation tops

As filed on W-2/G-1. Subsea from 1,683 ft elevation.Download CSV →

FormationMD ftSubsea
B Palo Pinto2,544-861
B. Palo Pinto Lime2,544-861
Cross Cut Sand2,650-967
Cross Cut SD2,650-967
T Goen Lime2,952-1,269
T. Goen Lime2,952-1,269

Perforations

Perforated and open-hole intervals.

FromToType
2,6522,658Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251091150 S
4.52,7637.875410 S
4.52,7647.875130 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 30, 2016Oct 19, 2015Yes
00Nov 13, 2008Dec 11, 2007Yes
00Oct 21, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09530050, documented in the API reference.