WELL · 42-095-30805 · DISTRICT 7

Whitehead #15

N

Concho County · Branch S. (Strawn) field  · Vertical

Whitehead #15 (API 42-095-30805) is a well in Concho County operated by Quintx Exploration Inc., completed January 20, 2002.

The RRC has issued 3 drilling permits between 1985 and 2006, permitted to 3,000 ft.

Completion filings report 10 formation tops, including Tannehill, Palo Pinto, Cross Cut "A", Crosscut A.

Its 3 leases have reported 3.49K barrels of oil and 304K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Quintx Exploration Inc.

Horseshoe Bay, TX · P-5 Y, filed Nov 7, 2008 · 209 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleQuintx Exploration Inc.
Production reportsWillowbend Investments, Inc.through Feb 2018
Latest permitQuintx Exploration, Inc.Nov 27, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
3
permits on file
Nov 27, 2006
last permit issued
Jan 20, 2002
completed
3.49K
cumulative oil, bbl
304K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 20, 2002
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Whitehead O-9-16123Branch, S. (Palo Pinto)Willowbend Investments, Inc.13.49K2.31KNov 2006 – Jul 2026
Whitehead G-9-187172Branch, S. (Strawn)Quintx Exploration, Inc.1021KJan 2002 – Nov 2006
Whitehead G-9-117326Branch, S. (Crosscut)Sedona Oil & Gas Corp.10281KJan 1993 – Jan 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintx Exploration, Inc.Jan 1993 → Nov 2007
  2. 2CTX Energy CorporationSep 1995 → Jan 1998
  3. 3Sedona Oil & Gas Corp.Feb 2002 → Jul 2002
  4. 4Willowbend Investments, Inc.Dec 2007 → Feb 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
629416-99RecompletionQuintx Exploration, Inc.Nov 21, 2006Nov 27, 2006Oct 4, 20062,650
511040-99RecompletionSedona Oil & Gas Corp.Jul 5, 2001Jul 10, 2001Jan 15, 20022,650
268371-99DrillQuintx Exploration, Inc.Mar 1, 1985Mar 1, 1985Mar 12, 19853,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-117326————
—— G-9-187172————
—— O-9-16123————

Formation tops

As filed on W-2/G-1. Subsea from 2,076 ft elevation.Download CSV →

FormationMD ftSubsea
Tannehill9341,142
Palo Pinto2,06511
Cross Cut "A"2,190-114
Crosscut A2,190-114
Cross Cut "B"2,237-161
Crosscut B2,237-161
Cross Cut "C"2,300-224
Crosscut C2,300-224
Strawn2,397-321
Ellenburger2,531-455

Perforations

Perforated and open-hole intervals.

FromToType
2,1322,136Perforated
2,3002,312Perforated
2,4752,485Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62527411150 S
4.52,6267.875270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 2007Nov 20, 2006Yes
00Feb 27, 2007——
00Apr 1, 2002Feb 14, 2002—
00Mar 4, 2002——
00Aug 7, 1985Jul 24, 1985—
00Aug 2, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09530805, documented in the API reference.