WELL · 42-095-31007 · DISTRICT 7

Whitehead #37

Plugged

Concho County · Branch S. (Ranger A) field  · Vertical

Whitehead #37 (API 42-095-31007) is a plugged well in Concho County, plugged June 13, 2005, last operated by Quintx Exploration Inc..

The RRC has issued one drilling permit, issued April 5, 1989, permitted to 1,900 ft.

Completion filings report 5 formation tops, including Salt Creek, Cook Lime, Bunger, Home Creek "A".

Operator of record

Quintx Exploration Inc.

Horseshoe Bay, TX · P-5 Inactive, filed Jan 25, 2007 · 209 permits on file · (830) 598-5900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleQuintx Exploration Inc.
Production reportsnone
Latest permitQuintx Exploration, Inc.Apr 5, 1989
1,900
total depth, ft
1
permits on file
Apr 5, 1989
last permit issued
Jun 14, 1989
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2005

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 14, 1989
Shut in
—
Plugged
Jun 13, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Whitehead G-9-131040Branch, S. (Ranger A)Quintx Exploration, Inc.100Jan 1993 – Jun 2005

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
357752-99DrillQuintx Exploration, Inc.Apr 4, 1989Apr 5, 1989—1,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-131040————

Formation tops

As filed on W-2/G-1. Subsea from 2,077 ft elevation.Download CSV →

FormationMD ftSubsea
Salt Creek8801,197
Cook Lime1,0571,020
Bunger1,542535
Home Creek "A"1,665412
Ranger A1,766311

Perforations

Perforated and open-hole intervals.

FromToType
1,7741,780Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512012.7550 S
4.51,9007.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 11, 1989Jun 22, 1989Yes
00Jul 8, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09531007, documented in the API reference.