WELL · 42-095-31310 · DISTRICT 7
Whitehead 1 #74
Concho County · Wildcat field · Vertical
Whitehead 1 #74 (API 42-095-31310) is a permitted well in Concho County filed by Quintx Exploration, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1991 and 2003, permitted to 1,950 ft.
Completion filings report 6 formation tops, including Tannehill, Tannell, King Lime, Bunger.
Operator of record
Horseshoe Bay, TX · P-5 Y, filed Nov 7, 2008 · 209 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Quintx Exploration Inc. |
| Production reports | Willowbend Investments, Inc.through Jul 2018 |
| Latest permit | Quintx Exploration, Inc.Oct 29, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,950
- total depth, ft
- 2
- permits on file
- Oct 29, 2003
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 68.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Whitehead G-9-197313 | Branch, S. (Ranger A) | Willowbend Investments, Inc. | 1 | 0 | 68.1K | Oct 2001 – Jul 2026 |
| Whitehead 1 O-9-14300 | Wildcat | Quintx Exploration, Inc. | 3 | 0 | 0 | Sep 1995 – Jul 2005 |
| Whitehead O-9-12765 | Wildcat | Quintx Exploration, Inc. | 7 | 0 | 0 | Jan 1993 – Jun 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Quintx Exploration, Inc.Aug 2003 → Nov 2007
- 2Willowbend Investments, Inc.Dec 2007 → Jul 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 538003-99 | Recompletion | Quintx Exploration, Inc. | Apr 22, 1991 | Oct 29, 2003 | May 30, 1991 | 1,950 |
| 387063-99 | Drill | Quintx Exploration, Inc. | Apr 22, 1991 | Apr 26, 1991 | May 30, 1991 | 1,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-197313 | — | — | — | — |
| — | — O-9-12765 | — | — | — | — |
| — | — O-9-14300 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,058 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 916 | 1,142 |
| Tannell | 916 | 1,142 |
| King Lime | 1,262 | 796 |
| Bunger | 1,527 | 531 |
| Burger | 1,527 | 531 |
| Home Creek | 1,648 | 410 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,752 | 1,756 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 106 | 11 | 50 S |
| 4.5 | 1,820 | 7.875 | 425 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 27, 2004 | Sep 5, 2003 | Yes |
| 00 | Oct 29, 2003 | — | — |
| 00 | Jan 12, 1996 | Nov 7, 1991 | Yes |
| 00 | Nov 19, 1991 | Nov 7, 1991 | Yes |
| 00 | Nov 14, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-31310 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-31310 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09531310, documented in the API reference.