WELL · 42-095-31430 · DISTRICT 7

SU-Tesoro #2

Plugged

Concho County · Wildcat field  · Vertical

SU-Tesoro #2 (API 42-095-31430) is a plugged well in Concho County, plugged January 21, 1992, last operated by Spenergy Corp.

The RRC has issued one drilling permit, issued December 23, 1991, permitted to 2,100 ft.

It was permitted by Spenergy Corp. and has since transferred to Spenergy Corp on the wellbore schedule.

Operator of record

Spenergy Corp

Permitted by Spenergy Corp.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSpenergy Corp.Dec 23, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,100
total depth, ft
1
permits on file
Dec 23, 1991
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 21, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
395149-99DrillSpenergy Corp.Dec 16, 1991Dec 23, 1991Jan 15, 19922,100

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09531430, documented in the API reference.