WELL · 42-095-31474 · DISTRICT 7
Hoover #2
Concho County · Pipe Dream (King Sand) field · Vertical
Hoover #2 (API 42-095-31474) is a plugged well in Concho County, plugged August 10, 1995, last operated by Marshall & Winston Inc..
The RRC has issued one drilling permit (amended once), issued June 2, 1992, permitted to 2,400 ft.
Completion filings report 3 formation tops, including Cook Sand, King Lime, King Sand.
Its 2 leases have reported 107K barrels of oil and 27.2K mcf of gas since January 1993, last reporting in July 2022. The leases carry 8 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Apr 4, 2026 · 359 permits on file · (432) 553-9747
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Marshall & Winston Inc. |
| Production reports | Marshall & Winston, Inc.through Jan 2010 |
| Latest permit | Marshall & Winston, Inc.Jun 2, 1992 |
- 2,400
- total depth, ft
- 2
- permits on file
- Jun 2, 1992
- last permit issued
- —
- completed
- 107K
- cumulative oil, bbl
- 27.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 10, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hoover O-9-13364 | Pipe Dream (King Sand) | Marshall & Winston, Inc. | 5 | 107K | 27.2K | Jan 1993 – Jul 2022 |
| Hoover O-9-13254 | Lonesome Dove II (King Sand) | Marshall & Winston, Inc. | 3 | 0 | 0 | Jan 1993 – Apr 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Marshall & Winston, Inc.Jan 1993 → Jan 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 399883-98 | Field transfer | Marshall & Winston, Inc. | Dec 16, 1992 | Jun 2, 1992 | — | 2,400 |
| 399883-99 | Drill | Marshall & Winston, Inc. | Jun 2, 1992 | Jun 2, 1992 | Jun 2, 1992 | 2,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-13254 | — | — | — | — |
| — | — O-9-13364 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,087 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cook Sand | 1,702 | 385 |
| King Lime | 2,028 | 59 |
| King Sand | 2,040 | 47 |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 310 | 11 | 150 S |
| 5.5 | 2,250 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 12, 1993 | Dec 17, 1992 | — |
| 00 | Jan 29, 1993 | Oct 15, 1992 | — |
| 00 | Nov 20, 1992 | Oct 15, 1992 | — |
| 00 | Oct 28, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-31474 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-31474 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- May 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000078225 | H-1 Injection | Plugged Sep 7, 1995 | 1,000 | 1,000 | 2,050–2,064 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09531474, documented in the API reference.