WELL · 42-095-31511 · DISTRICT 7

Murray #1

Plugged

Concho County · Dark Horse (Goen Lime) field  · Vertical

Murray #1 (API 42-095-31511) is a plugged well in Concho County, plugged November 1, 2025, last operated by Smith Joe T. Inc..

The RRC has issued one drilling permit (amended once), issued November 4, 1992, permitted to 4,000 ft.

It was permitted by Srg Oil Corporation and has since transferred to Smith Joe T. Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including B/Saddle Creek, B/Saddle Crk., Palo Pinto, Goen Lime.

Its lease has reported 2.75K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Smith Joe T. Inc.

Permitted by SRG Oil Corporation; the EWA schedule now lists a different operator.

Hawley, TX · P-5 Y, filed Nov 4, 2025 · 1 permits on file · (325) 537-2201

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Joe T. Inc.
Production reportsLeclair Operating Co., Inc.through Mar 1995
Latest permitSRG Oil CorporationNov 4, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
2
permits on file
Nov 4, 1992
last permit issued
Jan 6, 1993
completed
2.75K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 6, 1993
Shut in
—
Plugged
Nov 1, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Murray O-9-13388Dark Horse (Goen Lime)Smith, Joe T., Inc.12.75K21Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1SRG Oil CorporationJan 1993 → Dec 1993
  2. 2Leclair Operating Co., Inc.Jan 1994 → Mar 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
405461-98DrillSRG Oil CorporationJan 19, 1993Nov 4, 1992Nov 16, 19924,000
405461-99DrillSRG Oil CorporationOct 30, 1992Nov 4, 1992—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-13388————

Formation tops

As filed on W-2/G-1. Subsea from 2,183 ft elevation.Download CSV →

FormationMD ftSubsea
B/Saddle Creek1,780403
B/Saddle Crk.1,780403
Palo Pinto3,160-977
Goen Lime3,801-1,618
Goen Lm.3,801-1,618

Perforations

Perforated and open-hole intervals.

FromToType
3,8013,805Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62525611125 S
4.53,9347.875590 S
4.5—7.875590 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 14, 1998Feb 11, 1998—
00Aug 5, 1996Feb 15, 1996—
00Feb 18, 1993Jan 15, 1993Yes
00Jan 28, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.91M
bbl, all reported
Apr 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000084242H-1 InjectionPlugged Dec 12, 20251,5001,1002,256–3,805

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09531511, documented in the API reference.