WELL · 42-095-31522 · DISTRICT 7
Crawford #1
Concho County · Halloran (Goen) field · Vertical
Crawford #1 (API 42-095-31522) is a plugged well in Concho County, plugged November 5, 2010, last operated by Paint Rock Operating LLC.
The RRC has issued one drilling permit (amended once), issued December 9, 1992, permitted to 4,000 ft.
It was permitted by Verdad Oil & Gas Corporation and has since transferred to Paint Rock Operating LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Base Of Breckenridge, Palo Pinto, Capps, Goen.
Its 2 leases have reported 48.1K barrels of oil and 131K mcf of gas since January 1993, last reporting in June 2011. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Verdad Oil & Gas Corporation; the EWA schedule now lists a different operator.
San Angelo, TX · P-5 Y, filed Apr 4, 2026 · 285 permits on file · (508) 560-1686
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Paint Rock Operating LLC |
| Production reports | Paint Rock Operating, LLCthrough May 2010 |
| Latest permit | Verdad Oil & Gas CorporationDec 9, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 2
- permits on file
- Dec 9, 1992
- last permit issued
- Jan 21, 1993
- completed
- 48.1K
- cumulative oil, bbl
- 131K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 21, 1993
- Shut in
- —
- Plugged
- Nov 5, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Crawford O-9-13483 | Halloran (Goen) | Paint Rock Operating, LLC | 2 | 48.1K | 124K | Jul 1993 – Jun 2011 |
| Crawford G-9-144214 | Halloran (Goen) | Verdad Oil & Gas Corporation | 1 | 0 | 6.33K | Jan 1993 – Sep 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Verdad Oil & Gas CorporationJan 1993 → Aug 2003
- 2Newton Corp.,theSep 2003 → Dec 2004
- 3IpactJan 2005 → Jan 2006
- 4G E Operating, Inc.Mar 2006 → Jul 2006
- 5Paint Rock Operating, LLCOct 2007 → May 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 406963-98 | Drill | Verdad Oil & Gas Corporation | Feb 23, 1993 | Dec 9, 1992 | Dec 8, 1992 | 3,900 |
| 406963-99 | Drill | Verdad Oil & Gas Corporation | Dec 7, 1992 | Dec 9, 1992 | — | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-144214 | — | — | — | — |
| — | — O-9-13483 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,239 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base of Breckenridge | 2,180 | 59 |
| Palo PintoBASE OF PALO PINTO | 3,038 | -799 |
| Capps | 3,678 | -1,439 |
| Goen | 3,788 | -1,549 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,790 | 3,798 | Perforated |
| 3,805 | 3,809 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 293 | 11 | 125 S |
| 4.5 | 3,858 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 23, 1993 | Aug 4, 1993 | — |
| 00 | Aug 13, 1993 | — | — |
| 00 | Apr 13, 1993 | Feb 24, 1993 | Yes |
| 00 | Mar 10, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-31522 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-31522 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09531522, documented in the API reference.