WELL · 42-095-31533 · DISTRICT 7

Whitehead #86

Plugged

Concho County · Branch South (Tannehill) field  · Vertical

Whitehead #86 (API 42-095-31533) is a plugged well in Concho County, plugged June 17, 2000, last operated by Ctx Energy Corporation.

The RRC has issued 2 drilling permits between 1993 and 1994, permitted to 1,650 ft.

Completion filings report 6 formation tops, including Tannehill, Lower Cook, King, Upper Ivan.

Its 2 leases have reported 2.47K barrels of oil and 5.72K mcf of gas since May 1993, last reporting in November 2013. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

CTX Energy Corporation

Dallas, TX · P-5 Y, filed Sep 14, 2001 · 25 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCTX Energy Corporation
Production reportsCTX Energy Corporationthrough Nov 1994
Latest permitCTX Energy CorporationSep 26, 1994
1,650
total depth, ft
2
permits on file
Sep 26, 1994
last permit issued
Dec 15, 1994
completed
2.47K
cumulative oil, bbl
5.72K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1993 THROUGH Nov 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 15, 1994
Shut in
—
Plugged
Jun 17, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Whitehead O-9-13446Branch, S. (Ivan, Upper)Willowbend Investments, Inc.22.47K5.72KMay 1993 – Nov 2013
Whitehead O-9-13726Branch, South (Tannehill)CTX Energy Corporation100Dec 1994 – Aug 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1CTX Energy CorporationMay 1993 → Aug 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
428101-99RecompletionCTX Energy CorporationSep 16, 1994Sep 26, 1994Oct 24, 19941,650
408123-99DrillCTX Energy CorporationJan 15, 1993Jan 15, 1993Feb 8, 19931,550

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-13446————
—— O-9-13726————

Formation tops

As filed on W-2/G-1. Subsea from 2,111 ft elevation.Download CSV →

FormationMD ftSubsea
TannehillUPPER TANNEHILL9561,155
Lower Cook1,143968
King1,313798
Upper Ivan1,424687
Gunsite1,457654
Bunger1,568543

Perforations

Perforated and open-hole intervals.

FromToType
956968Perforated
1,4241,430Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62514112.25140 S
4.51,6457.125340 S
4.51,6457.875340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 14, 1995Jan 17, 1995—
00Jan 27, 1995May 26, 1993Yes
00Jun 25, 1993May 26, 1993Yes
00Jun 3, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09531533, documented in the API reference.