WELL · 42-095-31533 · DISTRICT 7
Whitehead #86
Concho County · Branch South (Tannehill) field · Vertical
Whitehead #86 (API 42-095-31533) is a plugged well in Concho County, plugged June 17, 2000, last operated by Ctx Energy Corporation.
The RRC has issued 2 drilling permits between 1993 and 1994, permitted to 1,650 ft.
Completion filings report 6 formation tops, including Tannehill, Lower Cook, King, Upper Ivan.
Its 2 leases have reported 2.47K barrels of oil and 5.72K mcf of gas since May 1993, last reporting in November 2013. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed Sep 14, 2001 · 25 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | CTX Energy Corporation |
| Production reports | CTX Energy Corporationthrough Nov 1994 |
| Latest permit | CTX Energy CorporationSep 26, 1994 |
- 1,650
- total depth, ft
- 2
- permits on file
- Sep 26, 1994
- last permit issued
- Dec 15, 1994
- completed
- 2.47K
- cumulative oil, bbl
- 5.72K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1993 THROUGH Nov 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 15, 1994
- Shut in
- —
- Plugged
- Jun 17, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Whitehead O-9-13446 | Branch, S. (Ivan, Upper) | Willowbend Investments, Inc. | 2 | 2.47K | 5.72K | May 1993 – Nov 2013 |
| Whitehead O-9-13726 | Branch, South (Tannehill) | CTX Energy Corporation | 1 | 0 | 0 | Dec 1994 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1CTX Energy CorporationMay 1993 → Aug 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 428101-99 | Recompletion | CTX Energy Corporation | Sep 16, 1994 | Sep 26, 1994 | Oct 24, 1994 | 1,650 |
| 408123-99 | Drill | CTX Energy Corporation | Jan 15, 1993 | Jan 15, 1993 | Feb 8, 1993 | 1,550 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-13446 | — | — | — | — |
| — | — O-9-13726 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,111 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| TannehillUPPER TANNEHILL | 956 | 1,155 |
| Lower Cook | 1,143 | 968 |
| King | 1,313 | 798 |
| Upper Ivan | 1,424 | 687 |
| Gunsite | 1,457 | 654 |
| Bunger | 1,568 | 543 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 956 | 968 | Perforated |
| 1,424 | 1,430 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 141 | 12.25 | 140 S |
| 4.5 | 1,645 | 7.125 | 340 S |
| 4.5 | 1,645 | 7.875 | 340 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 14, 1995 | Jan 17, 1995 | — |
| 00 | Jan 27, 1995 | May 26, 1993 | Yes |
| 00 | Jun 25, 1993 | May 26, 1993 | Yes |
| 00 | Jun 3, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-31533 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-31533 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09531533, documented in the API reference.