WELL · 42-095-31627 · DISTRICT 7

Carter R. L. #1

Y

Concho County · Millersview W. (Cross Cut SD) field · Producing  · Vertical

Carter R. L. #1 (API 42-095-31627) is a well in Concho County operated by O Dell Mitchell, completed May 1, 2000 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1994 and 2000, permitted to 4,000 ft.

It was permitted by Bowerman Oil & Gas, Inc. and has since transferred to O Dell Mitchell on the wellbore schedule.

Completion filings report 7 formation tops, including Breckenridge Lm, Breckenridge Ls, Palo Pinto, Cross Cut Sand.

No lease production has been reported under this well’s leases.

Operator of record

O Dell Mitchell

Permitted by Bowerman Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Cross Plains, TX · P-5 Y, filed Apr 4, 2026 · (254) 212-9701

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleO Dell Mitchell
Production reportsO'Dell, Mitchellthrough Apr 2026
Latest permitBowerman Oil & Gas, Inc.May 1, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
2
permits on file
May 1, 2000
last permit issued
May 1, 2000
completed
0
cumulative oil, bbl
259K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 1, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carter, R.L. G-9-154239Millersview, W. (Camar Sd.)O'Dell, Mitchell1070KJan 1995 – Jul 2026
Carter, R. L. G-9-177129Millersview, W. (Cross Cut SD)O'Dell, Mitchell10189KMay 2000 – Jul 2026

Gas, mcf lease total

Last 12 months 12 · prior 12 13(-8%)

012202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bowerman Oil & Gas, Inc.Jan 1995 → Dec 2004
  2. 2Swartz Oil CompanyJan 2005 → Jul 2008
  3. 3Willowbend Investments, Inc.Aug 2008 → May 2017
  4. 4O'Dell, MitchellJun 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
494564-99RecompletionBowerman Oil & Gas, Inc.May 1, 2000May 1, 2000Apr 24, 20004,000
429680-99DrillBowerman Oil & Gas, Inc.Nov 3, 1994Nov 9, 1994Jan 10, 19954,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-154239————
—— G-9-177129————

Formation tops

As filed on W-2/G-1. Subsea from 1,697 ft elevation.Download CSV →

FormationMD ftSubsea
Breckenridge LM1,68215
Breckenridge LS1,68215
Palo PintoPALO PINTO LIME2,514-817
Palo PintoPALO PINTO LS2,514-817
Cross Cut Sand2,689-992
Camar Sand2,920-1,223
Camar Sand2,926-1,229
Goen Lime3,076-1,379
Goen LM3,076-1,379

Perforations

Perforated and open-hole intervals.

FromToType
2,6892,695Perforated
2,9272,931Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512412.25110 S
4.53,1017.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 14, 2000May 15, 2000Yes
00Jun 8, 2000——
00Jul 7, 1995Apr 13, 1995Yes
00Jun 13, 1995—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09531627, documented in the API reference.