WELL · 42-095-31790 · DISTRICT 7
Carter, R. L. #2
Concho County · Vertical
Carter, R. L. #2 (API 42-095-31790) is a plugged well in Concho County, plugged October 10, 1997, last operated by Pickens Company, Inc., The.
The RRC has issued 3 drilling permits between 1997 and 2000, permitted to 4,000 ft.
Completion filings report 9 formation tops, including Coleman Junction, Coleman Juntion, L. Cook, Lower Cook.
Operator of record
Dallas, TX · P-5 Y, filed Jun 7, 2013 · 178 permits on file · (214) 369-7471
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | O'Dell, Mitchellthrough Jun 2022 |
| Latest permit | Pickens Company, Inc., TheMay 15, 2000 |
- 4,000
- total depth, ft
- 3
- permits on file
- May 15, 2000
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 507K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1999 THROUGH Oct 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Oct 10, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carter, R. L. G-9-174602 | Millersview, W. (Camar Sd.) | O'Dell, Mitchell | 1 | 0 | 507K | Sep 1999 – Oct 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pickens Company, Inc., TheOct 1999 → Oct 2003
- 2Bowerman Oil & Gas, Inc.Dec 2003 → Dec 2004
- 3Swartz Oil CompanyJan 2005 → Jul 2008
- 4Willowbend Investments, Inc.Aug 2008 → May 2017
- 5O'Dell, MitchellJul 2017 → Jun 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 495033-99 | Field transfer | Pickens Company, Inc., The | May 15, 2000 | May 15, 2000 | Aug 4, 1999 | 3,196 |
| 485434-99 | Reenter | Pickens Company, Inc., The | Jun 24, 1999 | Jul 9, 1999 | Aug 4, 1999 | 3,196 |
| 467629-99 | Drill | Bowerman Oil & Gas, Inc. | Sep 16, 1997 | Sep 16, 1997 | Sep 28, 1997 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-174602 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,741 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 470 | 1,271 |
| Coleman Juntion | 470 | 1,271 |
| L. Cook | 1,556 | 185 |
| Lower Cook | 1,556 | 185 |
| King Sand | 2,090 | -349 |
| King SD | 2,090 | -349 |
| Cross Cut | 2,720 | -979 |
| Crosscut | 2,720 | -979 |
| Camar | 2,940 | -1,199 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,942 | 2,956 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 115 | 11 | 50 S |
| 4.5 | 3,015 | 7.875 | 50 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 27, 2000 | Feb 17, 2000 | Yes |
| 00 | Dec 22, 1999 | Oct 25, 1999 | — |
| 00 | Nov 2, 1999 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-31790 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-31790 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09531790, documented in the API reference.