WELL · 42-095-31837 · DISTRICT 7
Hendricks B #1
Concho County · Dare I (Hope) field · Vertical
Hendricks B #1 (API 42-095-31837) is a plugged well in Concho County, plugged April 24, 2000, last operated by Pickens Company Inc. The.
The RRC has issued 2 drilling permits between 1998 and 1999, permitted to 1,900 ft.
Completion filings report 3 formation tops, including Top Lower Cook Sand, Top Lower King Sand, Top Swastika Sand.
Its 2 leases have reported 134 barrels of oil and 1 mcf of gas since November 1998, last reporting in May 2000. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed Jun 7, 2013 · 178 permits on file · (214) 369-7471
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pickens Company Inc. The |
| Production reports | Pickens Company, Inc., Thethrough Nov 1998 |
| Latest permit | Pickens Company, Inc., TheJun 14, 1999 |
- 1,900
- total depth, ft
- 2
- permits on file
- Jun 14, 1999
- last permit issued
- Nov 2, 1998
- completed
- 134
- cumulative oil, bbl
- 1
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1998 THROUGH May 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 2, 1998
- Shut in
- —
- Plugged
- Apr 24, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hendricks "B" O-9-14892 | Dare I (Hope) | Pickens Company, Inc., The | 1 | 134 | 1 | Nov 1998 – May 2000 |
| Hendricks "B" O-9-14875 | Wildcat | Pickens Company, Inc., The | 1 | 0 | 0 | Apr 1999 – Jul 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pickens Company, Inc., TheNov 1998 → Nov 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 485112-99 | Field transfer | Pickens Company, Inc., The | Jun 10, 1999 | Jun 14, 1999 | Sep 24, 1998 | 1,900 |
| 479353-99 | Drill | Pickens Company, Inc., The | Sep 10, 1998 | Sep 14, 1998 | Sep 24, 1998 | 1,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-14875 | — | — | — | — |
| — | — O-9-14892 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,007 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Top Lower Cook Sand | 1,497 | 510 |
| Top Lower King Sand | 1,650 | 357 |
| Top Swastika Sand | 1,860 | 147 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,482 | 1,492 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 201 | 11 | 115 S |
| 4.5 | 1,595 | 7.875 | 445 S |
| 4.5 | 1,595 | 9.875 | 445 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 10, 1999 | Jun 10, 1999 | Yes |
| 00 | Jun 16, 1999 | — | — |
| 00 | May 11, 1999 | Apr 12, 1999 | Yes |
| 00 | Apr 16, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-31837 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-31837 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09531837, documented in the API reference.