WELL · 42-095-31847 · DISTRICT 7
Baethge #1
Concho County · Money Pit (Camar) field · Vertical
Baethge #1 (API 42-095-31847) is a plugged well in Concho County, plugged June 4, 2020, last operated by De Larios R. V. Ltd..
The RRC has issued one drilling permit, issued January 22, 1999, permitted to 4,000 ft.
It was permitted by Bowerman Oil & Gas, Inc. and has since transferred to De Larios R. V. Ltd. on the wellbore schedule.
Completion filings report 2 formation tops, including Palo Pinto, Camar Sand.
Its lease has reported 1.93K barrels of oil and 44 mcf of gas since April 1999, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Bowerman Oil & Gas, Inc.; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Dec 6, 2019 · 24 permits on file · (940) 733-5810
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | DE Larios R. V. Ltd. |
| Production reports | DE Larios, R. V., Ltd.through Jul 2012 |
| Latest permit | Bowerman Oil & Gas, Inc.Jan 22, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Jan 22, 1999
- last permit issued
- Mar 2, 1999
- completed
- 1.93K
- cumulative oil, bbl
- 44
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 2, 1999
- Shut in
- —
- Plugged
- Jun 4, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baethge O-9-14912 | Money Pit (Camar) | DE Larios, R. V., Ltd. | 2 | 1.93K | 44 | Apr 1999 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bowerman Energy CompanyApr 1999 → Jul 1999
- 2Leclair Operating Co., Inc.Sep 1999 → Jul 2000
- 3DE Larios, R. V., Ltd.Nov 2010 → Jul 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 482217-99 | Drill | Bowerman Oil & Gas, Inc. | Jan 22, 1999 | Jan 22, 1999 | Jan 26, 1999 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-14912 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,921 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 2,650 | -729 |
| Camar Sand | 3,082 | -1,161 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,083 | 3,091 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 226 | 11 | 100 S |
| 4.5 | 3,083 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 8, 1999 | May 6, 1999 | Yes |
| 00 | Oct 5, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-31847 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-31847 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09531847, documented in the API reference.