WELL · 42-095-31885 · DISTRICT 7
Dierschke #1
Concho County · Vertical
Dierschke #1 (API 42-095-31885) is a plugged well in Concho County, plugged January 16, 2000, last operated by Daubert Operating. L.L.C..
The RRC has issued 2 drilling permits between 1999 and 2000, permitted to 3,600 ft.
Completion filings report 6 formation tops, including Base Stockwether, Base Crystal Falls, Top Bunger, Palo Pinto.
Its lease has reported 4.83K barrels of oil and 2.18K mcf of gas since January 2001, last reporting in July 2026.
Operator of record
San Antonio, TX · P-5 Y, filed Jun 6, 2008 · 33 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | O'Dell, Mitchellthrough Apr 2026 |
| Latest permit | Daubert Operating. L.L.C.Nov 17, 2000 |
- 3,600
- total depth, ft
- 2
- permits on file
- Nov 17, 2000
- last permit issued
- —
- completed
- 4.83K
- cumulative oil, bbl
- 2.18K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 16, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dierschke O-9-15148 | Low & Behold (Crosscut 1) | O'Dell, Mitchell | 1 | 4.83K | 2.18K | Jan 2001 – Jul 2026 |
Oil, barrels lease total
Last 12 months 9 · prior 12 9(+0%)
Gas, mcf lease total
Last 12 months 4 · prior 12 1(+300%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Daubert Operating, L.L.C.Jan 2001 → Dec 2002
- 2Smith, Joe T., Inc.Apr 2008 → Dec 2012
- 3O'Dell, MitchellJan 2013 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 502120-99 | Reenter | Daubert Operating. L.L.C. | Nov 17, 2000 | Nov 17, 2000 | Nov 30, 2000 | 3,220 |
| 490664-99 | Drill | Pickens Company, Inc., The | Dec 27, 1999 | Dec 29, 1999 | Dec 30, 1999 | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-15148 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,736 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Stockwether | 1,254 | 482 |
| Base Crystal Falls | 1,533 | 203 |
| Top Bunger | 2,012 | -276 |
| Palo PintoBASE PALO PINTO | 2,602 | -866 |
| Top Crosscut 1 Sand | 2,648 | -912 |
| Top Camar Sand | 2,970 | -1,234 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,648 | 2,664 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 118 | 11 | 45 S |
| 5.5 | 3,166 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 4, 2001 | Feb 12, 2001 | Yes |
| 00 | Jun 19, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-31885 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-31885 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09531885, documented in the API reference.