WELL · 42-095-31950 · DISTRICT 7

Maggie H #3

Plugged

Concho County · Whitworth Ranch (Crosscut) field  · Vertical

Maggie H #3 (API 42-095-31950) is a plugged well in Concho County, plugged June 13, 2008, last operated by Bowerman Exploration Inc..

The RRC has issued 2 drilling permits between 2001 and 2003, permitted to 3,000 ft.

Completion filings report 2 formation tops, including Palo Pinto, Cross Cut Sd..

Operator of record

Bowerman Exploration Inc.

Fort Worth, TX · P-5 Y, filed Nov 6, 2009 · 11 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBowerman Exploration Inc.
Production reportsnone
Latest permitBowerman Exploration, Inc.May 6, 2003
3,000
total depth, ft
2
permits on file
May 6, 2003
last permit issued
Jan 22, 2003
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2001 THROUGH Jun 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 22, 2003
Shut in
—
Plugged
Jun 13, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maggie H G-9-194373Whitworth Ranch (Crosscut)Bowerman Exploration, Inc.100Jan 2003 – Jun 2008
Maggie "H" O-9-15169WildcatBowerman Exploration, Inc.100Aug 2001 – May 2003

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
531599-99RecompletionBowerman Exploration, Inc.May 6, 2003May 6, 2003Jan 22, 20031,970
507330-99DrillBowerman Energy CompanyApr 3, 2001Apr 3, 2001Apr 12, 20013,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-194373————
—— O-9-15169————

Formation tops

As filed on W-2/G-1. Subsea from 1,759 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoBASE PALO PINTO LS1,842-83
Palo Pinto1,842-83
Cross Cut Sd.1,871-112

Perforations

Perforated and open-hole intervals.

FromToType
1,8711,875Perforated
2,1442,147Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512312.25100 S
4.52,6157.875240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 2003May 6, 2003Yes
00May 22, 2003——
00Sep 25, 2001Aug 21, 2001Yes
00Sep 6, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09531950, documented in the API reference.