WELL · 42-095-32027 · DISTRICT 7

Nitram-Pope #1

Plugged

Concho County · Paint Rock W. (Goen D) field  · Vertical

Nitram-Pope #1 (API 42-095-32027) is a plugged well in Concho County, plugged May 8, 2018, last operated by J & J Services Company.

The RRC has issued one drilling permit (amended once), issued February 14, 2003, permitted to 3,600 ft.

It was permitted by Nitram Oil And Gas Inc. and has since transferred to J & J Services Company on the wellbore schedule.

Completion filings report 2 formation tops, including Anhydrite Gap, Dolomite.

Its lease has reported 3.25K barrels of oil and 6.41K mcf of gas since December 2002, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

J & J Services Company

Permitted by Nitram Oil and Gas Inc.; the EWA schedule now lists a different operator.

San Angelo, TX · P-5 Y, filed Jul 4, 2026 · 13 permits on file · (325) 656-5770

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ & J Services Company
Production reportsJ & J Services Companythrough Jun 2015
Latest permitNitram Oil and Gas Inc.Feb 14, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,600
total depth, ft
2
permits on file
Feb 14, 2003
last permit issued
Jul 30, 2004
completed
3.25K
cumulative oil, bbl
6.41K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 30, 2004
Shut in
—
Plugged
May 8, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nitram-Pope O-9-15353Paint Rock, W. (Goen D)J & J Services Company53.25K6.41KDec 2002 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Nitram Oil and Gas Inc.Dec 2002 → Feb 2007
  2. 2J & J Services CompanySep 2009 → Jun 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
528482-98DrillNitram Oil and Gas Inc.Sep 7, 2004Feb 14, 2003May 14, 20033,600
528482-99DrillNitram Oil and Gas Inc.Feb 14, 2003Feb 14, 2003—3,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-15353————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Anhydrite Gap600
Dolomite705

Perforations

Perforated and open-hole intervals.

FromToType
705710Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510011100 S
4.59637.875135 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 2005Aug 31, 2004Yes
00May 24, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09532027, documented in the API reference.