WELL · 42-095-32234 · DISTRICT 7
Stansberry L #8
Concho County · Millersview W. (Camar Sd.) field · Producing · Vertical
Stansberry L #8 (API 42-095-32234) is a well in Concho County operated by Martin Matrix Inc., completed January 7, 2008 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued September 14, 2007, permitted to 4,000 ft.
It was permitted by Leclair Operating CO., Inc. and has since transferred to Martin Matrix Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including B/Saddlecreek Lime, T/Upper Crosscut Sand, Camar Sand.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Leclair Operating Co., Inc.; the EWA schedule now lists a different operator.
San Angelo, TX · P-5 Y, filed Oct 4, 2025 · 2 permits on file · (325) 650-1294
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Martin Matrix Inc. |
| Production reports | Martin Matrix Inc.through Apr 2026 |
| Latest permit | Leclair Operating Co., Inc.Sep 14, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Sep 14, 2007
- last permit issued
- Jan 7, 2008
- completed
- 0
- cumulative oil, bbl
- 27.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 7, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stansberry "L" G-9-237352 | Millersview, W. (Camar Sd.) | Martin Matrix Inc. | 1 | 0 | 27.1K | Jan 2008 – Jul 2026 |
Gas, mcf lease total
Last 12 months 329 · prior 12 287(+15%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Leclair Operating Co., Inc.Feb 2008 → Oct 2013
- 2Leclair Operating, L.L.C.Nov 2013 → Jan 2018
- 3Martin Matrix Inc.May 2018 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 644219-99 | Drill | Leclair Operating Co., Inc. | Aug 10, 2007 | Sep 14, 2007 | Nov 1, 2007 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-237352 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,774 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Saddlecreek Lime | 1,355 | 419 |
| T/Upper Crosscut Sand | 2,605 | -831 |
| Camar Sand | 2,936 | -1,162 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,936 | 2,944 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 127 | 11 | 85 S |
| 4.5 | 3,033 | 7.875 | 330 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 19, 2008 | Feb 1, 2008 | Yes |
| 00 | Aug 2, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-32234 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-32234 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09532234, documented in the API reference.