WELL · 42-097-05330 · DISTRICT 9

Westman-Siddal #2

Plugged

Cooke County · Cooke County Regular field  · Vertical

Westman-Siddal #2 (API 42-097-05330) is a plugged well in Cooke County, plugged February 2, 2021, last operated by Felderhoff Production Company.

The RRC has issued 2 drilling permits between 1997 and 2006, permitted to 2,732 ft.

It was permitted by Fidelity Energy CO. and has since transferred to Felderhoff Production Company on the wellbore schedule.

Its lease has reported 4.8K barrels of oil and 10 mcf of gas since January 1993, last reporting in May 2021. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Felderhoff Production Company

Permitted by Fidelity Energy Co.; the EWA schedule now lists a different operator.

Muenster, TX · P-5 Y, filed Jan 4, 2026 · 468 permits on file · (940) 768-9791

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFelderhoff Production Company
Production reportsGrayson Petroleum Companythrough Jan 2017
Latest permitFidelity Energy Co.Jul 3, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,732
total depth, ft
2
permits on file
Jul 3, 2006
last permit issued
Sep 18, 1997
completed
4.8K
cumulative oil, bbl
10
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 18, 1997
Shut in
—
Plugged
Feb 2, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Westman-Siddal O-13-11589Cooke County RegularFelderhoff Production Company34.8K10Jan 1993 – May 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fidelity Energy Co.Dec 1993 → Apr 2008
  2. 2Grayson Petroleum CompanyMay 2008 → Jan 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
621643-99ReenterFidelity Energy Co.Jun 27, 2006Jul 3, 2006Mar 5, 20072,000
465716-99ReclassFidelity Energy Co.Jul 31, 1997Sep 16, 1997Sep 25, 19932,732

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-11589————
—— O-13-11589————

Perforations

Perforated and open-hole intervals.

FromToType
1,6181,628Perforated
1,6301,632Perforated
2,4272,432Perforated
2,4272,432Open hole
2,4274,232Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.75106—65 S
—10610.7565 S
15.52,4278.75525 S
5.52,4278.75525 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 12, 2017Mar 23, 2017—
00Jul 1, 2010Mar 29, 2010—
00May 13, 2010——
00Nov 21, 1997Sep 26, 1997—
00Jan 31, 1994Dec 17, 1993—
00Jan 28, 1991Jan 13, 1990Yes
00May 18, 1990Apr 24, 1990—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

42K
bbl, last 12 reported months
341K
bbl, all reported
Aug 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000071568H-1 InjectionPlugged Dec 11, 20022251,0002,427–2,432

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 42,000 · prior 12 53,600(-22%)

02K4K6K19961997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09705330, documented in the API reference.