WELL · 42-097-31295 · DISTRICT 9
Segraves Sam #2
Cooke County · Era West (Ellen Detrital) field · Injection · Vertical
Segraves Sam #2 (API 42-097-31295) is a well in Cooke County operated by Richland Energy Inc., completed July 13, 1978 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued June 20, 1978, permitted to 1,995 ft.
It was permitted by Campbell, T. K. and has since transferred to Richland Energy Inc. on the wellbore schedule.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 44.4K barrels injected in the 12 months reported through August 2025.
Operator of record
Permitted by Campbell, T. K.; the EWA schedule now lists a different operator.
Irving, TX · P-5 Y, filed Nov 4, 2025 · 11 permits on file · (301) 717-6966
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Richland Energy Inc. |
| Production reports | Campbell, T. K.through May 2002 |
| Latest permit | Campbell, T. K.Jun 20, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,995
- total depth, ft
- 1
- permits on file
- Jun 20, 1978
- last permit issued
- Jul 13, 1978
- completed
- 0
- cumulative oil, bbl
- 12
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 13, 1978
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Segraves, Sam O-13-19021 | Era, West (Ellen Detrital) | Richland Energy, Inc. | 7 | 0 | 12 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 26843-99 | Drill | Campbell, T. K. | Jun 20, 1978 | Jun 20, 1978 | — | 1,995 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-19021 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,323 | 1,335 | Perforated |
| — | 1,335 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,371 | 7.875 | 32 S |
| 4.5 | — | 7.875 | 380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 5, 1987 | Feb 4, 1987 | — |
| 00 | Jan 12, 1984 | Sep 7, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-097-31295 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-097-31295 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 44.4K
- bbl, last 12 reported months
- 1.13M
- bbl, all reported
- Aug 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000032217 | W-14 Disposal | Active | 500 | 350 | 1,323–1,335 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 44,400 · prior 12 44,400(+0%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09731295, documented in the API reference.