WELL · 42-097-31418 · DISTRICT 9
Thompson - Church Unit #2
Cooke County · Cooke County Regular field · Vertical
Thompson - Church Unit #2 (API 42-097-31418) is a plugged well in Cooke County, plugged August 19, 1985, last operated by Bls Production CO. Inc..
The RRC has issued 3 drilling permits between 1979 and 2008, permitted to 3,290 ft.
Completion filings report one formation top, including Trinity.
Its lease has reported 60.7K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed Mar 4, 2026 · 112 permits on file · (940) 447-4552
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BLS Production Co. Inc. |
| Production reports | BLS Production Co., Inc.through Apr 2026 |
| Latest permit | BLS Production Co., Inc.Sep 19, 2008 |
- 3,290
- total depth, ft
- 3
- permits on file
- Sep 19, 2008
- last permit issued
- Nov 13, 1984
- completed
- 60.7K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 13, 1984
- Shut in
- —
- Plugged
- Aug 19, 1985
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thompson - Church Unit O-13-19459 | Cooke County Regular | BLS Production Co., Inc. | 4 | 60.7K | 21 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1,733 · prior 12 1,822(-5%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Felderhoff Production CompanyJan 1993 → Feb 1997
- 2BLS Production Co., Inc.Mar 1997 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 669492-99 | Reenter | BLS Production Co., Inc. | Aug 20, 2008 | Sep 19, 2008 | Nov 6, 2009 | 3,290 |
| 261843-99 | Recompletion | Felderhoff Production Co. | Nov 26, 1984 | Dec 10, 1984 | — | 3,283 |
| 53670-99 | Drill | Felderhoff Production Co. | Jul 25, 1979 | Jul 25, 1979 | — | 3,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-19459 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 857 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Trinity | 1,300 | -443 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,930 | 2,932 | Perforated |
| 3,254 | 3,270 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 100 | 12.25 | 95 S |
| 2.375 | 3,228 | — | — |
| 4.5 | 3,283 | 7.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 22, 2010 | Jan 14, 2010 | — |
| 00 | Feb 17, 2010 | — | — |
| 00 | Jan 18, 1985 | Nov 28, 1984 | — |
| 00 | Jan 12, 1984 | Aug 15, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-097-31418 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-097-31418 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09731418, documented in the API reference.