WELL · 42-097-32591 · DISTRICT 9
Allen #1
Cooke County · Cannon (3140) field · Vertical
Allen #1 (API 42-097-32591) is a plugged well in Cooke County, plugged December 17, 2010, last operated by Grayson Petroleum Company.
The RRC has issued 2 drilling permits between 1984 and 2007, permitted to 3,250 ft.
Completion filings report 3 formation tops, including Top Trinity, Trinity, Strawn.
Its 2 leases have reported 6.6K barrels of oil and 22 mcf of gas since January 1993, last reporting in August 2011. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Whitesboro, TX · P-5 Y, filed Feb 4, 2026 · 124 permits on file · (903) 267-1127
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Grayson Petroleum Company |
| Production reports | Grayson Petroleum Companythrough Aug 2010 |
| Latest permit | Grayson Petroleum CompanyMar 13, 2007 |
- 3,250
- total depth, ft
- 2
- permits on file
- Mar 13, 2007
- last permit issued
- Jun 16, 2008
- completed
- 6.6K
- cumulative oil, bbl
- 22
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 16, 2008
- Shut in
- —
- Plugged
- Dec 17, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Allen O-13-31088 | Cannon (3140) | Grayson Petroleum Company | 1 | 724 | 0 | Jun 2008 – Aug 2011 |
| Allen, E. T. O-13-24586 | Cannon (3140) | Grayson Petroleum Company | 1 | 5.88K | 22 | Jan 1993 – May 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bay Rock Operating CompanyJan 1993 → Jan 1998
- 2Grayson Petroleum CompanyFeb 1998 → Aug 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 634669-99 | Reenter | Grayson Petroleum Company | Mar 6, 2007 | Mar 13, 2007 | Mar 16, 2008 | 3,210 |
| 243861-99 | Drill | Bossart Oil Corporation | Jun 18, 1984 | Jun 21, 1984 | — | 3,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-24586 | — | — | — | — |
| — | — O-13-31088 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 823 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Top Trinity | 482 | 341 |
| Trinity | 482 | 341 |
| Strawn | 3,070 | -2,247 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,089 | 3,092 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 115 | 12.25 | 100 sx |
| 4.5 | 3,210 | 7.875 | 745 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 18, 2008 | Aug 13, 2008 | Yes |
| 00 | Nov 6, 2008 | — | — |
| 00 | Sep 12, 1984 | Aug 21, 1984 | — |
| 00 | Sep 1, 1984 | Aug 21, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-097-32591 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-097-32591 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09732591, documented in the API reference.