WELL · 42-097-32839 · DISTRICT 9
Paclik C. J. #2
Cooke County · Tepco (3100 Ellenburger) field · Injection · Vertical
Paclik C. J. #2 (API 42-097-32839) is a well in Cooke County operated by Felderhoff Production Company, completed May 1, 1986 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued April 1, 1986, permitted to 3,300 ft.
It was permitted by Texas Exploration & Prod. CO. and has since transferred to Felderhoff Production Company on the wellbore schedule.
Completion filings report one formation top, including Strawn.
Its lease has reported 38.9K barrels of oil and 32 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 36.5K barrels injected in the 12 months reported through August 2025.
Operator of record
Permitted by Texas Exploration & Prod. Co.; the EWA schedule now lists a different operator.
Muenster, TX · P-5 Y, filed Jan 4, 2026 · 468 permits on file · (940) 768-9791
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Felderhoff Production Company |
| Production reports | Grayson Petroleum Companythrough Sep 2018 |
| Latest permit | Texas Exploration & Prod. Co.Apr 1, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,300
- total depth, ft
- 1
- permits on file
- Apr 1, 1986
- last permit issued
- May 1, 1986
- completed
- 38.9K
- cumulative oil, bbl
- 32
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 1, 1986
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Paclik, C. J. O-13-25797 | Tepco (3100 Ellenburger) | Felderhoff Production Company | 2 | 38.9K | 32 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texas Exploration & Prod. Co.Jan 1993 → Dec 1995
- 2Brammer Supply, Inc.Jan 1996 → Oct 2001
- 3Hep Oil Company, Ltd.Nov 2001 → Mar 2002
- 4Grayson Petroleum CompanyApr 2002 → Sep 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 300608-99 | Drill | Texas Exploration & Prod. Co. | Apr 1, 1986 | Apr 1, 1986 | — | 3,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-25797 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 728 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 1,740 | -1,012 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,737 | 1,747 | Perforated |
| 1,740 | 2,118 | Perforated |
| 1,750 | 1,760 | Perforated |
| 2,108 | 2,118 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 94 | 12.25 | 80 S |
| 4.5 | 2,226 | 7.875 | 705 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 13, 2022 | Apr 19, 2022 | — |
| 00 | Sep 21, 1987 | Sep 9, 1987 | — |
| 00 | Sep 15, 1986 | Aug 28, 1986 | Yes |
| 00 | Sep 10, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-097-32839 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-097-32839 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 36.5K
- bbl, last 12 reported months
- 1.79M
- bbl, all reported
- Aug 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000062900 | W-14 Disposal | Active | 200 | 400 | 1,740–2,120 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 36,500 · prior 12 34,675(+5%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09732839, documented in the API reference.