WELL · 42-097-33636 · DISTRICT 9

Toni #1H

Plugged

Cooke County · Newark East (Barnett Shale) field  · Horizontal

Toni #1H (API 42-097-33636) is a plugged horizontal well in Cooke County, plugged January 25, 2016, last operated by Borderline Operating Corp..

The RRC has issued 2 drilling permits between 2003 and 2004, permitted to 9,000 ft.

It was permitted by Abernathy Auto, Inc. and has since transferred to Borderline Operating Corp. on the wellbore schedule.

Completion filings report 3 formation tops, including Conglomerate, Barnett, Forestburg.

Its 2 leases have reported 2.13K barrels of oil and 73.1K mcf of gas since August 2003, last reporting in May 2016. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Borderline Operating Corp.

Permitted by Abernathy Auto, Inc.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Dec 4, 2025 · 98 permits on file · (940) 550-4900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBorderline Operating Corp.
Production reportsBorderline Operating Corp.through Dec 2014
Latest permitAbernathy Auto, Inc.Jan 22, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
Jan 22, 2004
last permit issued
Jul 1, 2004
completed
2.13K
cumulative oil, bbl
73.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH May 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 2004
Shut in
—
Plugged
Jan 25, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Toni O-13-30380Newark, East (Barnett Shale)Borderline Operating Corp.12.13K73.1KNov 2004 – May 2016
Toni O-13-30178WildcatAbernathy Auto, Inc.100Aug 2003 – Dec 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Abernathy Auto, Inc.Nov 2004 → Apr 2008
  2. 2Merritt Operating, Inc.May 2008 → Nov 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
541065-99RecompletionAbernathy Auto, Inc.Jan 22, 2004Jan 22, 2004Jan 30, 20049,000
531928-99DrillMerritt Operating, Inc.May 14, 2003May 14, 2003Jun 7, 20039,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-30178————
—— O-13-30380————

Formation tops

As filed on W-2/G-1. Subsea from 1,064 ft elevation.Download CSV →

FormationMD ftSubsea
Conglomerate6,600-5,536
BarnettUPPER BARNETT7,480-6,416
Forestburg7,530-6,466
BarnettLOWER BARNETT7,800-6,736
BarnettBARNETT SHALE7,815-6,751

Perforations

Perforated and open-hole intervals.

FromToType
8,1998,700Perforated
8,8209,564Perforated
9,79310,280Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62581612.25425 S
5.58,4117.875425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 2, 2005Nov 22, 2004Yes
00Dec 22, 2004Jul 7, 2003Yes
00Aug 22, 2003Jul 7, 2003Yes
00Aug 13, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09733636, documented in the API reference.