WELL · 42-105-31905 · DISTRICT 7
McMullan Joe Wylie #5
Crockett County · Hunt-Baggett (Strawn) field · Vertical
Mcmullan Joe Wylie #5 (API 42-105-31905) is a plugged well in Crockett County, plugged March 31, 2023, last operated by Djh Oil & Gas LLC.
The RRC has issued 2 drilling permits between 1978 and 1982, permitted to 9,523 ft.
It was permitted by Harrison Interests, Ltd. and has since transferred to Djh Oil & Gas LLC on the wellbore schedule.
Operator of record
Permitted by Harrison Interests, Ltd.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Jun 4, 2026 · 1 permits on file · (713) 858-9737
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | DJH Oil & Gas LLC |
| Production reports | DJH Oil & Gas LLCthrough Jan 2022 |
| Latest permit | Harrison Interests, Ltd.Feb 17, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,523
- total depth, ft
- 2
- permits on file
- Feb 17, 1982
- last permit issued
- Jun 6, 1978
- completed
- 0
- cumulative oil, bbl
- 437K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 6, 1978
- Shut in
- —
- Plugged
- Mar 31, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McMullan, Joe Wylie G-9-77250 | Live Oak Draw (Strawn) | DJH Oil & Gas LLC | 1 | 0 | 0 | Jan 1993 – May 2023 |
| McMullan, Joe Wylie G-9-97744 | Davidson Ranch (Penn. 7890) | DJH Oil & Gas LLC | 1 | 0 | 437K | Jan 1993 – May 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Harrison Interests, Ltd.Jan 1993 → Oct 2017
- 2DJH Oil & Gas LLCNov 2017 → Jan 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 150820-99 | Recompletion | Harrison Interests, Ltd. | Feb 17, 1982 | Feb 17, 1982 | — | 9,523 |
| 21381-99 | Drill | Harrison, Dan J., Jr. | Apr 4, 1978 | Apr 4, 1978 | — | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-77250 | — | — | — | — |
| — | — G-9-97744 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,710 | 8,380 | Perforated |
| 9,124 | 9,196 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,225 | 11 | 300 S |
| 8.625 | 1,241 | 11 | 300 S |
| 2.375 | 7,700 | — | — |
| 2.375 | 9,003 | — | — |
| 4.5 | 9,379 | 7.875 | 900 S |
| 4.5 | 9,428 | 7.875 | 900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Feb 4, 1982 | — |
| 00 | Jan 12, 1984 | Jul 3, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-105-31905 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-105-31905 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10531905, documented in the API reference.