WELL · 42-105-32405 · DISTRICT 7
Hoover Armond 17A #1
Crockett County · American (Clear Fork) field · Vertical
Hoover Armond 17a #1 (API 42-105-32405) is a plugged well in Crockett County, plugged March 21, 2008, last operated by Production Gathering Company LP.
The RRC has issued 2 drilling permits between 1979 and 1995, permitted to 7,700 ft.
It was permitted by Sonat Exploration CO. - Midland and has since transferred to Production Gathering Company LP on the wellbore schedule.
Operator of record
Production Gathering Company LP
Permitted by Sonat Exploration Co. - Midland; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Nov 4, 2025 · (972) 680-9737
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Production Gathering Company LP |
| Production reports | Sonat Exploration Co. - Midlandthrough Sep 1995 |
| Latest permit | Sonat Exploration Co. - MidlandAug 25, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,700
- total depth, ft
- 2
- permits on file
- Aug 25, 1995
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.22K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Mar 21, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hoover, Armond 17A G-9-155419 | American (Clear Fork) | Production Gathering Company, LP | 1 | 0 | 438 | May 1995 – Mar 2008 |
| Hoover, Armond 17A G-9-87614 | American (Canyon) | Sonat Exploration Co. - Midland | 1 | 0 | 780 | Jan 1993 – Jun 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dameron Petroleum Corp.Jan 1993 → Aug 1994
- 2Sonat Exploration Company -TylerSep 1994 → Nov 1994
- 3Sonat Exploration Co. - MidlandDec 1994 → Sep 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 439329-99 | Recompletion | Sonat Exploration Co. - Midland | Aug 25, 1995 | Aug 25, 1995 | May 24, 1995 | 7,700 |
| 55679-99 | Drill | Dameron Petroleum Corp. | Aug 15, 1979 | Aug 15, 1979 | Oct 26, 1979 | 7,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-87614 | — | — | — | — |
| — | — G-9-155419 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,448 | 7,107 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,060 | 11 | 400 S |
| 2.375 | 6,286 | — | — |
| 4.5 | 7,530 | 8.75 | 435 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 2, 1995 | — | — |
| 00 | Jan 12, 1984 | May 14, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-105-32405 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-105-32405 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.