WELL · 42-105-35104 · DISTRICT 7

Halff Field Unit #1310

Y

Crockett County · Halff field · Shut IN  · Vertical

Halff Field Unit #1310 (API 42-105-35104) is a well in Crockett County operated by Ecowell Oil And Gas LLC, completed January 15, 1986 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued August 27, 1985, permitted to 1,950 ft.

It was permitted by Canyon Resources, Inc and has since transferred to Ecowell Oil And Gas LLC on the wellbore schedule.

Completion filings report one formation top, including Grayburg.

Its lease has reported 277K barrels of oil and 4.27K mcf of gas since January 1993, last reporting in July 2026. The lease carries 137 wells, so these are lease totals, not this well alone.

Operator of record

Ecowell Oil and Gas LLC

Permitted by Canyon Resources, Inc; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Jun 4, 2026 · (726) 234-1691

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEcowell Oil and Gas LLC
Production reportsEcowell Oil and Gas LLCthrough Jun 2024
Latest permitCanyon Resources, IncAug 27, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,950
total depth, ft
1
permits on file
Aug 27, 1985
last permit issued
Jan 15, 1986
completed
277K
cumulative oil, bbl
4.27K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 15, 1986
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 137 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Halff Field Unit O-9-4709HalffEcowell Oil and Gas LLC137277K4.27KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 161(-100%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Canyon Resources, IncJan 1993 → Mar 1993
  2. 2Chanc West, Inc.Jun 1993 → Mar 1995
  3. 3Zachry Oil and Gas PropertiesApr 1995 → Jul 2001
  4. 4Quay Valley, Inc.Aug 2001 → Dec 2002
  5. 5HDL Oil Properties, Inc.Jan 2003 → Oct 2006
  6. 6Hank Oil & Gas, Inc.Nov 2006 → Feb 2018
  7. 7Ecowell Oil and Gas LLCFeb 2024 → Jun 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
283434-99DrillCanyon Resources, IncAug 27, 1985Aug 27, 1985—1,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-4709————

Formation tops

As filed on W-2/G-1. Subsea from 2,462 ft elevation.Download CSV →

FormationMD ftSubsea
GrayburgTOP GRAYBURG1,806656

Perforations

Perforated and open-hole intervals.

FromToType
1,8061,813Perforated
1,8161,825Perforated
1,8271,835Perforated
1,8481,851Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62575411370 S
4.51,9597.875340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 1986Mar 24, 1986Yes
00Apr 1, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10535104, documented in the API reference.