WELL · 42-105-38857 · DISTRICT 7
Rocky #2043
Crockett County · Millspaugh Ranch (San Andres) field · Vertical
Rocky #2043 (API 42-105-38857) is a plugged well in Crockett County, plugged July 25, 2024, last operated by Xog Operating LLC.
The RRC has issued one drilling permit, issued May 9, 2002, permitted to 1,700 ft.
It was permitted by Xeric Oil & Gas Corporation and has since transferred to Xog Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including B/Cretaceous, Grayburg, San Andres.
Operator of record
Permitted by Xeric Oil & Gas Corporation; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Oct 4, 2025 · 137 permits on file · (432) 425-0869
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XOG Operating LLC |
| Production reports | XOG Operating LLCthrough Mar 2008 |
| Latest permit | Xeric Oil & Gas CorporationMay 9, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,700
- total depth, ft
- 1
- permits on file
- May 9, 2002
- last permit issued
- Jun 28, 2002
- completed
- 0
- cumulative oil, bbl
- 43.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2002 THROUGH Sep 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 28, 2002
- Shut in
- —
- Plugged
- Jul 25, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rocky G-9-190705 | Millspaugh Ranch (San Andres) | XOG Operating LLC | 1 | 0 | 43.4K | Jun 2002 – Sep 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Xeric Oil & Gas CorporationAug 2002 → Jun 2005
- 2XOG Operating LLCJul 2005 → Mar 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 519867-99 | Drill | Xeric Oil & Gas Corporation | May 9, 2002 | May 9, 2002 | May 26, 2002 | 1,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-190705 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,129 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Cretaceous | 420 | 1,709 |
| Grayburg | 1,032 | 1,097 |
| San Andres | 1,138 | 991 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,290 | 1,292 | Perforated |
| 1,304 | 1,311 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 502 | 9.875 | 250 S |
| 4.5 | 1,348 | 6.25 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 23, 2002 | Aug 29, 2002 | Yes |
| 00 | Oct 4, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-105-38857 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-105-38857 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10538857, documented in the API reference.