WELL · 42-107-30926 · DISTRICT 8

English D #6

N

Crosby County · Hoople (Clear Fork) field  · Vertical

English D #6 (API 42-107-30926) is a well in Crosby County operated by Socorro Exploration Inc., completed February 15, 1995.

The RRC has issued one drilling permit, issued September 8, 1994, permitted to 4,600 ft.

Completion filings report one formation top, including Clear Fork.

Its 2 leases have reported 1.33M barrels of oil and 177K mcf of gas since April 1993, last reporting in July 2026. The leases carry 51 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 144K barrels injected in the 12 months reported through March 2026.

Operator of record

Socorro Exploration Inc.

Lubbock, TX · P-5 Y, filed Feb 4, 2026 · 87 permits on file · (806) 781-9722

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSocorro Exploration Inc.
Production reportsGungoll, Carl E. Exploration LLCthrough Apr 2026
Latest permitSocorro Exploration, Inc.Sep 8, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,600
total depth, ft
1
permits on file
Sep 8, 1994
last permit issued
Feb 15, 1995
completed
1.33M
cumulative oil, bbl
177K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 15, 1995
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 51 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hoople (Clear Fork) Unit O-11-67529Hoople (Clear Fork)Gungoll, Carl E. Exploration LLC441.25M170KApr 1996 – Jul 2026
English D O-11-67031Hoople (Clear Fork)Socorro Exploration, Inc.773.8K7.23KApr 1993 – Jul 1996

Oil, barrels lease total

Last 12 months 17,147 · prior 12 19,957(-14%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Socorro Exploration, Inc.Apr 1993 → Jun 2005
  2. 2Gungoll, Carl E. Exploration LLCJul 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427775-99DrillSocorro Exploration, Inc.Sep 6, 1994Sep 8, 1994Dec 11, 19944,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67031————
—— O-11-67529————

Formation tops

As filed on W-2/G-1. Subsea from 3,035 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK4,347-1,312
Clear ForkCLEARFORK4,350-1,315

Perforations

Perforated and open-hole intervals.

FromToType
4,3674,442Perforated
4,4194,437Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62544412.25245 S
2.8754,2484.5200 S
4.54,5127.875806 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 9, 2007Dec 8, 2006—
00Feb 14, 1997May 20, 1996—
00Mar 15, 1996Mar 10, 1995Yes
00Mar 23, 1995Mar 10, 1995Yes
00Mar 17, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

144K
bbl, last 12 reported months
3.6M
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000084113H-1 InjectionActive7001,6004,346–4,490

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 144,097 · prior 12 148,527(-3%)

05K10K15K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10730926, documented in the API reference.