WELL · 42-107-30944 · DISTRICT 8
Hancock Sue #1
Crosby County · Hoople (Clear Fork) field · Injection · Vertical
Hancock Sue #1 (API 42-107-30944) is a well in Crosby County operated by Gungoll Carl E. Exploration LLC, completed April 2, 1996 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued November 30, 1995, permitted to 4,600 ft.
It was permitted by Socorro Exploration, Inc. and has since transferred to Gungoll Carl E. Exploration LLC on the wellbore schedule.
Completion filings report one formation top, including Clear Fork.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 153K barrels injected in the 12 months reported through March 2026.
Operator of record
Gungoll Carl E. Exploration LLC
Permitted by Socorro Exploration, Inc.; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Apr 4, 2026 · 106 permits on file · (405) 949-8816
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gungoll Carl E. Exploration LLC |
| Production reports | none |
| Latest permit | Socorro Exploration, Inc.Nov 30, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,600
- total depth, ft
- 1
- permits on file
- Nov 30, 1995
- last permit issued
- Apr 2, 1996
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 2, 1996
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hancock, Sue O-11-67554 | Hoople (Clear Fork) | Gungoll, Carl E. Exploration LLC | 1 | 0 | 0 | Apr 1996 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 442212-99 | Drill | Socorro Exploration, Inc. | Nov 27, 1995 | Nov 30, 1995 | Dec 30, 1995 | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-67554 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,035 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Clear ForkCLEARFORK | 4,424 | -1,389 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,424 | 4,479 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 324 | 12.25 | 245 S |
| 4.5 | 4,510 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 14, 1997 | Oct 3, 1996 | — |
| 00 | May 9, 1996 | Apr 9, 1996 | Yes |
| 00 | Apr 18, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-107-30944 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-107-30944 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 153K
- bbl, last 12 reported months
- 3.43M
- bbl, all reported
- Mar 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000085261 | H-1 Injection | Active | 500 | 1,600 | 4,424–4,479 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 153,075 · prior 12 148,581(+3%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10730944, documented in the API reference.