WELL · 42-109-32193 · DISTRICT 8

Petro State #1

Plugged

Culberson County · Geraldine (Ford) field  · Vertical

Petro State #1 (API 42-109-32193) is a plugged well in Culberson County, plugged August 9, 2000, last operated by Graystone Exploration Corp..

The RRC has issued one drilling permit, issued March 7, 1997, permitted to 3,500 ft.

It was permitted by Remuda Operating Company and has since transferred to Graystone Exploration Corp. on the wellbore schedule.

Completion filings report 3 formation tops, including Ramsey, Olds, Cherry Canyon.

Its lease has reported 52 barrels of oil since July 1997, last reporting in August 2003.

Operator of record

Graystone Exploration Corp.

Permitted by Remuda Operating Company; the EWA schedule now lists a different operator.

Garland, TX · P-5 Y, filed Jul 7, 2000 · 27 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGraystone Exploration Corp.
Production reportsGraystone Exploration Corp.through Nov 1997
Latest permitRemuda Operating CompanyMar 7, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
Mar 7, 1997
last permit issued
Jul 5, 1997
completed
52
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1997 THROUGH Aug 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 5, 1997
Shut in
—
Plugged
Aug 9, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Petro State O-10-35536Geraldine (Ford)Graystone Exploration Corp.1520Jul 1997 – Aug 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Remuda Operating CompanyJul 1997 → Jul 1997
  2. 2Graystone Exploration Corp.Aug 1997 → Nov 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
459597-99DrillRemuda Operating CompanyMar 7, 1997Mar 7, 1997Mar 16, 19973,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-35536————

Formation tops

As filed on W-2/G-1. Subsea from 3,264 ft elevation.Download CSV →

FormationMD ftSubsea
Ramsey2,322942
Olds2,384880
Cherry Canyon3,282-18

Perforations

Perforated and open-hole intervals.

FromToType
2,3902,395Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62531912.25200 S
4.53,5267.875435 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 16, 1997Nov 13, 1997Yes
00Dec 1, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10932193, documented in the API reference.