WELL · 42-109-32404 · DISTRICT 8
Taylor-State 110-28 #1
Culberson County · Ford West (Wolfcamp) field · Vertical
Taylor-State 110-28 #1 (API 42-109-32404) is a plugged well in Culberson County, plugged February 13, 2015, last operated by Carrizo (Eagle Ford) LLC.
The RRC has issued one drilling permit, issued August 4, 2011, permitted to 9,700 ft.
It was permitted by Devon Energy Production CO, L.P. and has since transferred to Carrizo (Eagle Ford) LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Bell Canyon, Bone Spring, Wolfcamp.
Operator of record
Permitted by Devon Energy Production Co, L.P.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Inactive, filed Mar 9, 2020 · 861 permits on file · (281) 589-5200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Carrizo (Eagle Ford) LLC |
| Production reports | Carrizo (Eagle Ford) LLCthrough May 2013 |
| Latest permit | Devon Energy Production Co, L.P.Aug 4, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,700
- total depth, ft
- 1
- permits on file
- Aug 4, 2011
- last permit issued
- May 1, 2013
- completed
- 0
- cumulative oil, bbl
- 5.51K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2012 THROUGH Feb 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 1, 2013
- Shut in
- —
- Plugged
- Feb 13, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Taylor-State 110-28 G-10-267904 | Ford, West (Wolfcamp) | Carrizo (Eagle Ford) LLC | 1 | 0 | 5.51K | Feb 2012 – Feb 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Carrizo (Eagle Ford) LLCApr 2013 → May 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 721438-99 | Drill | Devon Energy Production Co, L.P. | Aug 2, 2011 | Aug 4, 2011 | Sep 13, 2011 | 9,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-267904 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,670 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 1,590 | 2,080 |
| Bone Spring1ST BONE SPRING LIME | 5,005 | -1,335 |
| Wolfcamp | 7,894 | -4,224 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,350 | 9,270 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,460 | 17.5 | 1,650 S |
| 9.625 | 5,085 | 12.25 | 575 S |
| 5.5 | 9,620 | 8.75 | 1,315 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 23, 2014 | Sep 17, 2013 | — |
| 00 | May 28, 2013 | Apr 11, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-109-32404 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-109-32404 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10932404, documented in the API reference.