WELL · 42-115-32649 · DISTRICT 8
Lone Wolf #1
Dawson County · Vertical
Lone Wolf #1 (API 42-115-32649) is a permitted well in Dawson County filed by Siete Oil And Gas Corporation; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1982 and 1991, permitted to 8,000 ft.
Completion filings report 3 formation tops, including T/San Andres, T/Upper Spraberry, T/Lower Spraberry.
Its lease has reported 25.8K barrels of oil and 38.7K mcf of gas since January 1993, last reporting in August 2010. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Mar 7, 1997 · 50 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Landreth, Robert E.through Mar 2002 |
| Latest permit | Siete Oil and Gas CorporationJan 4, 1991 |
- 8,000
- total depth, ft
- 2
- permits on file
- Jan 4, 1991
- last permit issued
- —
- completed
- 25.8K
- cumulative oil, bbl
- 38.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lone Wolf O-11-66682 | RGS (Spraberry) | Landreth, Robert E. | 2 | 25.8K | 38.7K | Jan 1993 – Aug 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Siete Oil and Gas CorporationJan 1993 → Sep 1994
- 2Aratex Production CompanyOct 1994 → Mar 1998
- 3Landreth, Robert E.Apr 1998 → Mar 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 382683-99 | Drill | Siete Oil and Gas Corporation | Dec 21, 1990 | Jan 4, 1991 | Feb 22, 1991 | 8,000 |
| 180040-99 | Drill | TXO Production Corp. | Dec 14, 1982 | Dec 14, 1982 | — | 7,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-66682 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,891 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/San Andres | 3,615 | -724 |
| T/Upper Spraberry | 6,910 | -4,019 |
| T/Lower Spraberry | 7,492 | -4,601 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,196 | 7,213 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 340 | 17.5 | 350 S |
| 8.625 | 3,600 | 12.25 | 1,530 S |
| 5.5 | 7,500 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 20, 1991 | May 2, 1991 | Yes |
| 00 | May 7, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-115-32649 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-115-32649 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.