WELL · 42-115-32695 · DISTRICT 8

Drennan 208 #6 #6

N

Dawson County · Welch field  · Vertical

Drennan 208 #6 #6 (API 42-115-32695) is a well in Dawson County operated by Mcena Inc., completed May 18, 1992.

The RRC has issued one drilling permit (amended once), issued November 1, 1991, permitted to 4,950 ft.

Completion filings report one formation top, including San Andres.

Its 2 leases have reported 255K barrels of oil and 76 mcf of gas since January 1993, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

McEna Inc.

Tulsa, OK · P-5 Y, filed Mar 6, 1998 · 3 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcEna Inc.
Production reportsWalkabout Operating, LLCthrough Apr 2026
Latest permitMcEna Inc.Nov 1, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,950
total depth, ft
2
permits on file
Nov 1, 1991
last permit issued
May 18, 1992
completed
255K
cumulative oil, bbl
76
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 18, 1992
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Drennan "208" O-11-62366WelchWalkabout Operating, LLC8247K38Jan 1993 – Jul 2026
Drennan "208" #6 O-11-66923WelchMcEna Inc.17.97K38Jan 1993 – Dec 1997

Oil, barrels lease total

Last 12 months 2,365 · prior 12 2,215(+7%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1McEna Inc.Jan 1993 → Jul 1997
  2. 2Walsh Petroleum, Inc.Aug 1997 → Aug 2017
  3. 3Mosman Operating, LLCSep 2017 → Dec 2020
  4. 4Steadfast Oil & Gas, LLCJan 2021 → Oct 2022
  5. 5Walkabout Operating, LLCNov 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
393452-98DrillMcEna Inc.Jan 21, 1992Nov 1, 1991Mar 6, 19924,950
393452-99DrillMcEna Inc.Oct 30, 1991Nov 1, 1991—4,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-62366————
—— O-11-66923————

Formation tops

As filed on W-2/G-1. Subsea from 3,119 ft elevation.Download CSV →

FormationMD ftSubsea
San AndresTOP SAN ANDRES4,450-1,331
San Andres4,928-1,809

Perforations

Perforated and open-hole intervals.

FromToType
4,9284,938Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,96312.25580 S
4.54,9507.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 1, 2006Nov 7, 2005—
00Sep 17, 1997May 26, 1992Yes
00Nov 24, 1992May 26, 1992Yes
00Jul 3, 1992May 26, 1992Yes
00Jun 16, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
548K
bbl, all reported
Aug 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000087763H-1 InjectionActive3002,4504,928–4,938

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/11532695, documented in the API reference.